Citation: Hao Xuechao, Cao Le, Fang Ligang, Huang Xiaobin, Wang Yuhao, Qi Nannan. BIM Technology Applied in Gui'an Comprehensive Bonded Zoneto Guide Large Formwork. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(5): 35-38. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.06
2015, 7(5): 35-38. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.06
BIM Technology Applied in Gui'an Comprehensive Bonded Zoneto Guide Large Formwork
1. | CABR Technology Co., Ltd., Beijing 100013, China |
2. | CCCC First Highway Engineering Co., Ltd., Beijing Constrction Company, Beijing 100018, China |
Gui'an bonded area in Guizhou province is the second integrated free trade zone. The planning area is 2.2 km2, with an seine area of 2.1 km2. This project is a comprehensive service building in the free trade zone. BIM technology was carried out when the project started. This paper mainly introduces the application of BIM technology in the high support of the composite service building to solve the problems encountered in the implementation and demonstration of the original support scheme and to ensure the smooth, safe and punctual completion of the tall formwork for the entire project.
[1] |
顾琰.扣件式钢管脚手架高支模系统的设计与施工[J].建筑施工, 2008, 07:562-564.doi: 10.3969/j.issn.1004-1001.2008.07.018 |
[2] | |
[3] | |
[4] |
何关培. BIM技术应用丛书[M]. 建筑工业. 2011. |
[5] |
黄锰钢, 王鹏翊. BIM在施工总承包项目管理中的应用价值探索[J].土木建筑工程信息技术, 2013, 5 (5): 88-91. |
Metrics
- PDF Downloads(13)
- Abstract views(1606)
- HTML views(684)