• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Li Xinglong, Dong Litao, Zang Yibin, Yang Gangyuan, Li Zhenyuan, Wu Xingpan. BIM Fast Optimization Statistical Reinforcement Technology in the Second Avenue Project of Runcheng. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(5): 82-87. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.15

2015, 7(5): 82-87. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.15

BIM Fast Optimization Statistical Reinforcement Technology in the Second Avenue Project of Runcheng

1. 

CABR Technology Co., Ltd., Beijing 100013, China

2. 

Yunnan Construction Engineering General Contracting Company, Kuming 650011, China

Web Publishing Date: 2015-10-01

[1]

张建平, 范喆, 王阳利, 等.基于4D-BIM的施工资源动态管理与成本实时监控[J].施工技术.2011(04):37-40.doi: 10.3969/j.issn.1001-2206.2011.04.011

[2]

王青薇, 张建平.基于BIM的工程投资控制研究[J].工业建筑.2011(S1):1016-1019. 

[3]

特来福. 威廉姆斯. 现代信息技术在工程建设项目管理中的应用[M]. 中国建筑工业出版社. [美], 2009.

[4]

何关培.BIM总论[M].北京:中国建筑工业出版社, 2011:(9).

[5]

候景新, 张洪磊.PKPM系列软件在BIM技术中的新应用[J].土木建筑工程信息技术, 2011, 3(2):20-24.

Metrics
  • PDF Downloads(12)
  • Abstract views(1935)
  • HTML views(605)
Catalog

Figures And Tables

BIM Fast Optimization Statistical Reinforcement Technology in the Second Avenue Project of Runcheng

Li Xinglong, Dong Litao, Zang Yibin, Yang Gangyuan, Li Zhenyuan, Wu Xingpan

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com