• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Li Zhihua, Tao Ye, Zhong Changji. Influence of Empty Shield Tunneling Segment Pushed Ahead through on the Existing Tunnel. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(1): 108-113. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.20

2016, 8(1): 108-113. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.20

Influence of Empty Shield Tunneling Segment Pushed Ahead through on the Existing Tunnel

1. 

Shanghai Tianyou Engineering Consulting Co., Ltd., Shanghai 200092, China

2. 

School of Civil Engineering & Mechanics, Huazhong University of Science & Technology, Wuhan 430014, China

Web Publishing Date: 2016-02-01

Fund Project: 国家自然科学基金“基于复杂网络理论的地铁盾构施工诱发环境风险的时空演化机理与规律研究”(编号: 51408245)国家自然科学基金“基于复杂网络理论的地铁盾构施工诱发环境风险的时空演化机理与规律研究” 51408245

[1]

周诚. 地铁盾构施工地表变形时空演化规律与预警研究[D]. 华中科技大学, 2011.

[2]

邓彬, 顾小芳.盾构过空推段施工关键技术研究[J].现代隧道技术, 2012(2): 54-64. 

[3]

王乃龙.盾构空推过矿山法隧道施工浅析[J].中国科技信息, 2013(12): 61-71.doi: 10.3969/j.issn.1001-8972.2013.12.020

[4]

周文波.盾构法隧道施工技术及应用[M].中国建筑工业出版社, 2004.

[5]

张恒, 陈寿根, 邓稀肥.盾构掘进参数对地表沉降的影响分析[J].现代隧道技术. 2010(05).doi: 10.3969/j.issn.1009-6582.2010.05.017

[6]

罗石宝.盾构空推过暗挖法隧道施工工法[J].山西建筑, 2012, 38(9): 204-206. 

[7]

刘盈华, 张春强.盾构过矿山法空推施工工艺[J].科技信息, 2013, 5: 320.doi: 10.3969/j.issn.1673-1328.2013.08.312

Metrics
  • PDF Downloads(16)
  • Abstract views(1769)
  • HTML views(1043)
Catalog

Figures And Tables

Influence of Empty Shield Tunneling Segment Pushed Ahead through on the Existing Tunnel

Li Zhihua, Tao Ye, Zhong Changji

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com