• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Feng Qing, Lu Xiaolong, Wang Dejiang, Li Ke. Study on the Split of the Assembly Integral Concrete Beam based on BIM. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(5): 83-85. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.15

2016, 8(5): 83-85. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.15

Study on the Split of the Assembly Integral Concrete Beam based on BIM

1. 

The Civil Engineering Department of Shanghai University, Shanghai 200072, China

2. 

Economic and Technical Research Institute of the State network Shanghai Electric Power Company, Shanghai 200122, China

Web Publishing Date: 2016-10-01

[1]

王长虹, 杨兴富.节能-结构一体化产业化住宅研究[J], 施工技术, 2011, 345(40): 52-55. 

[2]

栗新.工业化预制装配式(PC)住宅建筑的设计研究与应用[J].建筑施工, 2008, 30(3): 201-202. 

[3]

R. Sacks, C. M. Eastman. A Target Benchmark of the Impact of Three-Dimensional Parametric Modeling in Precast Construction[J]. PCI journal: Prestressed Concrete Institute Journal[J]. 2005(4): 126-139.

[4]

李浩, 李永敢.工业化住宅预制构件深化设计流程及要点分析[J].施工技术. 2011(10): 111-114. 

[5]

张德海, 陈娜, 韩进宇.基于BIM的模块化设计方法在装配式建筑中的应用[J].土木建筑工程信息技术, 2014(6): 81-85. 

Metrics
  • PDF Downloads(18)
  • Abstract views(1591)
  • HTML views(694)
Catalog

Figures And Tables

Study on the Split of the Assembly Integral Concrete Beam based on BIM

Feng Qing, Lu Xiaolong, Wang Dejiang, Li Ke

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com