• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Cai Lianwei, Xu Zihao, Zhu Jin, Guo Ruifeng, Lin Lisi, Jiang Yueju. The Application of BIM in the Project of Ping′an International Finance Center South Tower Construction Management. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(1): 35-39. doi: 10.16670/j.cnki.cn11-5823/tu.2017.01.06

2017, 9(1): 35-39. doi: 10.16670/j.cnki.cn11-5823/tu.2017.01.06

The Application of BIM in the Project of Ping′an International Finance Center South Tower Construction Management

1. 

China Construction First Division Group Construction & Development Co., Ltd., Beijing 100102, China

2. 

Web Publishing Date: 2017-02-01

[1]

National Institute of Standards and Technology.2009, 4:13.

[2]

中建《建筑工程施工BIM应用指南》编委会, 中国建筑工业出版社.

[3]

曹铭. 基于IFC标准的建筑工程信息集成及4D施工管理研究[D]. 北京: 清华大学土木工程系, 2005.

[4]

应于垦.利用BIM搭建项目精细化管理平台[J].新鲁班, 2011, 2. 

[5]

陈倩, 张原.浅谈BIM技术及其应用[J].价值工程, 2012, 23.doi: 10.3969/j.issn.1006-4311.2012.12.257

Metrics
  • PDF Downloads(38)
  • Abstract views(2356)
  • HTML views(915)
Catalog

Figures And Tables

The Application of BIM in the Project of Ping′an International Finance Center South Tower Construction Management

Cai Lianwei, Xu Zihao, Zhu Jin, Guo Ruifeng, Lin Lisi, Jiang Yueju

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com