Citation: Yusheng Yang, Yuqiu Yin. Research on Cost Factors of Prefabricated Building Components Under EPC Mode Based on ISM-MICMAC Model. Journal of Information Technologyin Civil Engineering and Architecture, 2023, 15(2): 55-61. doi: 10.16670/j.cnki.cn11-5823/tu.2023.02.10
2023, 15(2): 55-61. doi: 10.16670/j.cnki.cn11-5823/tu.2023.02.10
Research on Cost Factors of Prefabricated Building Components Under EPC Mode Based on ISM-MICMAC Model
School of transportation engineering, Changsha University of Science and Technology, 410114, China |
At present, the cost problem is the main concern that restricts the development of assembled prefabricated buildings. With the integration of design, procurement and construction, the EPC mode has the characteristics of informatization, integration and specialization, which provides a direction for the project management and cost control of prefabricated buildings. Considering the increasing needs of prefabricated buildings and solving its cost problem, this paper studies the cost influencing factors of prefabricated building components from the perspective of EPC and according to the characteristics of prefabricated concrete buildings. Through the basic theory, this paper obtains 14 representative influencing factors and establishes ISM model to analyze the relationship between cost factors and obtain the surface direct factors, intermediate dynamic factors and deep leading factors affecting the cost. In this paper, the method MICMAC is used to analyze the dependency and driving force of cost factors and get the inner relationship between the factors is obtained. Finally, targeted suggestions are made to the above issues to provide direction for promoting prefabricated buildings.
[1] | |
[2] |
李辉山, 欧昙. 基于DEMATEL的装配式建筑成本影响因素分析[J]. 工程管理学报2019, 33(01): 34-38. |
[3] |
Lee J H, Park M, Lee H S, et al. Application of Activity-Based costing(ABC) for modular Building construction indirect costs calculation at the manufacturing Stage[J]. Korean Journal of Construction Engineering and Management, 2015, 16(4): 139-145.doi: 10.6106/KJCEM.2015.16.4.139 |
[4] |
Haron NA, Hassim S, Kadir MRA, et al. Building cost comparison between conventional and formwork system: A case study on four-story School buildings in Malaysia[J]. American Journal of Applied Sciences, 2005, 2(4): 819-823.doi: 10.3844/ajassp.2005.819.823 |
[5] |
李锦华, 李雪强, 马辉. 基于成本最优化的装配式建筑项目模式选择研究[J]. 建筑经济, 2018, 39(07): 33-36. |
[6] | |
[7] |
Zhao Na. Research on the Management Mode of EPC project of prefabricated Building Based on BIM Technology[J]. Open Access Library Journal2021, 08(07) : 1-13. |
[8] | |
[9] |
魏宏亮, 牛昌林, 刘福江, 等. 基于DEMATEL-AISM法的装配式建筑预制构件成本影响因素分析[J]. 建筑经济, 2021, 42(10): 83-88. |
[10] |
王乾坤, 段宏磊, 申楚雄, 等. 装配式建筑弹性供应链影响因素研究[J]. 建筑经济, 2021, 42(10): 79-82. |
[11] |
赵月溪. 装配式建筑发展制约因素与影响路径研究——以西安市为例[D]. 西安建筑科技大学. 2020. |
[12] |
陈伟, 武亚帅, 邹松, 等. 基于SEM的装配式建筑建造成本影响因素分析[J]. 土木工程与管理学报. 2019, 36(05): 50-55. |
[13] |
刘妍, 黎倩倩, 姚福义, 等. 基于ISM的预制构件生产风险因素分析[J]. 建筑经济, 2020, 41(04): 116-120. |
Metrics
- PDF Downloads(19)
- Abstract views(4510)
- HTML views(1469)