• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Qiaqin Wang, Xiaolong Zhao, Ganggang Zhao, Hongxun Ke. Research on the Construction Process of Informatization Collaborative Platform for Large and Complex Projects Based on the Fifth Phase Expansion Project of Chongqing Jiangbei International Airport. Journal of Information Technologyin Civil Engineering and Architecture, 2024, 16(2): 64-69. doi: 10.16670/j.cnki.cn11-5823/tu.2024.02.11

2024, 16(2): 64-69. doi: 10.16670/j.cnki.cn11-5823/tu.2024.02.11

Research on the Construction Process of Informatization Collaborative Platform for Large and Complex Projects Based on the Fifth Phase Expansion Project of Chongqing Jiangbei International Airport

1. 

Chongqing Airport Group Co. Ltd., Chongqing 401120, China

2. 

Chongqing University, Chongqing 400044, China

3. 

Chongqing University General Institute of Architectural Planning and Design Co., Ltd., Chongqing 400045, China

Corresponding author: 赵小龙,

Web Publishing Date: 2024-04-20

Fund Project: 2023年度重庆机场集团有限公司科研项目“基于BIM技术的复杂项目管理体系研究:以重庆机场T3B航站楼项目建设为例” 2023KYXM09

[1]

何清华, 罗岚. 大型复杂工程项目群管理协同与组织集成[M]. 北京: 科学出版社, 2014.

[2]

何清华, 卢勇, 何伟华. 基于Internet的大型工程项目信息系统[J]. 同济大学学报, 2002, 30(2): 238-242.

[3]

任宏. 巨项目管理[M]. 北京: 科学出版社, 2012.

[4]

刘星. 基于BIM的工程项目信息协同管理研究[D]. 重庆: 重庆大学, 2016.

[5]

杨青, 武高宁, 王丽珍. 大数据: 数据驱动下的工程项目管理新视角[J]. 系统工程理论与实践, 2017, 37(3): 710-719. 

[6]

Whyte J, Stasis A, Lindkvist C. Managing change in the delivery of complex projects: Configuration management, asset information and big data[J]. International Journal of Project Management, 2015, 32(2): 339-351.

[7]

Matthew A W, Stanley E F. Data science, predictive analytics, and big data: A revolution that will transform supply chain design and managerment[J]. Journal of Business Logistics, 2013, 34(2): 77-84.doi: 10.1111/jbl.12010

[8]

中华人民共和国住房和城乡建设部. GB/T 50328-2014. 建设工程文件归档规范(2019版). [G]. 北京: 中国建筑工业出版社, 2014, 8-9.

[9]

中华人民共和国住房和城乡建设部. JGJ/T185-2009. 建筑工程资料管理规程. [G]. 北京: 中国建筑工业出版社, 2009, 8-9.

[10]

戴子枢, 胡文峰, 刘学. 基于BIM的公路工程全生命周期信息传递技术研究[J]. 现代信息科技, 2021, 5(4): 117-120. 

[11]

张建设, 石世英, 吴层层. 信息论视角下工程项目的信息表达空间及损失[J] 土木工程与管理学报, 2018, 35(6): 101-106. 

[12]

王广斌, 张洋, 姜阵剑, 等. 建设项目施工前各阶段BIM应用方受益情况研究[J]. 山东建筑大学学报, 2009, 24(5): 438-442. 

Metrics
  • PDF Downloads(7)
  • Abstract views(133)
  • HTML views(78)
Catalog

Figures And Tables

Research on the Construction Process of Informatization Collaborative Platform for Large and Complex Projects Based on the Fifth Phase Expansion Project of Chongqing Jiangbei International Airport

Qiaqin Wang, Xiaolong Zhao, Ganggang Zhao, Hongxun Ke

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn