2014, 6(4): 82-87.
龙王渡大桥荷载试验方法研究
1. | 成都市交通发展研究院,成都 610042 |
2. | 中铁二院工程集团有限责任公司,成都 610031 |
Study on Load Test Method of the Long Wangdu Bridge
1. | Chengdu Municipal Transportation Development Research Institute, Chengdu 610042, China |
2. | Chia Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, China |
引用本文: 贾山, 邓子军. 龙王渡大桥荷载试验方法研究[J]. 土木建筑工程信息技术, 2014, 6(4): 82-87.
Citation: Jia Shan, Deng Zijun. Study on Load Test Method of the Long Wangdu Bridge[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(4): 82-87.
摘要:结合龙王渡大桥预应力混凝土T型简支梁桥的荷载试验,介绍了试验目的、内容和方法。讲述了荷载试验的加载工况, 分析研究了静动载试验结果,为桥梁交工验收提供科学依据。
Abstract: Combining with the load test of a prestressed concrete T type beam bridge, this paper Introduces the load test purpose, content, method and the load test conditions, analyse results of the static and dynamic load test, and provides scientific basis for the bridge acceptance.
[1] | |
[2] |
甚润水胡钊芳.公路桥梁荷载试验[M].北京:人民交通出版社. 2001. |
[3] |
JTG D62—2004, 公路钢筋混凝土及预应力混凝土桥涵设计规范[S]. |
[4] | |
[5] |
JTGD60-2004,公路桥涵设计通用规范 [S]. |
[6] |
JTG/T J21-2011,公路桥梁承载能力检测评定规程[S]. |
计量
- PDF下载量(10)
- 文章访问量(994)
- HTML全文浏览量(864)