Citation: Liao Ling, Wang Rong, Ling GuangQuan, Xing MingLong, Li XingYao, Sun ChunHui, Fu ShuangShuang, Wu ChanJiao. BIM Application in Guigang Culture and Art Center Constructed by Guangxi Construction Engineering Group No.1 Construction Engineering Co., Ltd.. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(6): 91-97. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.15
2018, 10(6): 91-97. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.15
BIM Application in Guigang Culture and Art Center Constructed by Guangxi Construction Engineering Group No.1 Construction Engineering Co., Ltd.
School of Civil Engineering and Architecture, Guangxi University of Science and Technology, Liuzhou 545006, China |
The Guigang Cultural and Art Center in Guangxi Province is a large-scale public building consisting of three main parts, the Grand Theatre, the Mass Art Museum and the Science and Technology Museum, and a public area, with a total building area of 113, 000 square meters. The project faces many difficulties, including wide construction area, tight construction period, large-scaled electro-mechanical engineering, high requirement for indoor decoration effect, difficult construction of steel facade flow surface, and high requirement for construction organization of roof steel membrane structure. Through the application of BIM technology in the construction phase, the project team has achieved more than ten targeted applications, including BIM modeling, electro-mechanical pipeline collision and optimization, refined decoration deepening and application, BIM engineering quantity calculation comparison, BIM5D site management, BIM-based green construction management, BIM application in guiding concrete pouring of large-scaled raft slab concrete, overlap of complex joints of steel structure, output and drawing based on Tekla Structures, AR display of detailed structure of steel structure model, construction of steel structure flowing skin, and etc. The application of BIM technology guarantees the successful implementation of the project, and provides scientific and technological support for the informatization application of the project and the improvement of quality and efficiency.
[1] | |
[2] | |
[3] | |
[4] |
张建平, 范喆, 王阳利等.基于4D-BIM的施工资源动态管理与成本实时监控[J].施工技术, 2011, 40(4):37-40.doi: 10.3969/j.issn.1001-2206.2011.04.011 |
[5] |
张春影, 高平, 汪茵等.施工图设计阶段BIM模型的工程算量问题研究[J].建筑经济, 2015, 36(8):52-56. |
[6] | |
[7] |
Ferrari P C, Silva N F, Lima E M. Building Information Modeling and Interoperability with Environmental Simulation Systems[M]. Springer Netherlands, 2010: 579-583. |
[8] |
Zhou H W, Zhou Y H, Zhao C J, et al. Feedback Design of Temperature Control Measures for Concrete Dams based on Real-Time Temperature Monitoring and Construction Process Simulation[J]. KSCE Journal of Civil Engineering, 2018, 22(5):1584-1592.doi: 10.1007/s12205-017-1935-5 |
[9] |
张磊, 周东明.Tekla Structures软件在钢结构工程中的应用[J].钢结构, 2015, 30(11):98-100, 68. |
[10] |
陈振明, 张耀林, 黄冬平.Tekla Structure软件在CCTV主楼钢结构深化设计中的应用[J].施工技术, 2008, 37(8):73-74. |
[11] |
丁烈云, 徐捷, 覃亚伟.建筑3D打印数字建造技术研究应用综述[J].土木工程与管理学报, 2015, 32(3):1-10.doi: 10.3969/j.issn.2095-0985.2015.03.001 |
Metrics
- PDF Downloads(26)
- Abstract views(1993)
- HTML views(973)