Citation: Yan Wenkai, Liu Jiyu, Huang Weihua, Ha Xin, Zhang Yidan, Yang Xuanfeng. BIM Design and Estimated Cost in Jiuquan City Museum Project. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(3): 76-79, 99.
2014, 6(3): 76-79, 99.
BIM Design and Estimated Cost in Jiuquan City Museum Project
China Academy of Building Research Architectural design institute, Beijing 100013, China |
By two years of technical training and the accumulation of experience, several typical project have been completed that from the start of design to operational.Designers have masted 3D design skills and experience, including Pipeline Integration, Building Energy Analysis and Virtual Roaming.BIM Center gathered BIM project implementation experience gradually, and sought a way that best BIM collaborative design solutions in the traditional design. Combined the Jiuquan project, this paper explored the relations and significance about the model of design and estimate, discussed the feasibility of project practice and analyzed its application value.
[1] |
马智亮. 《BIM技术及其在我国的应用问题和对策》. 2010, 5(10). |
[2] |
全国造价工程师执业资格考试培训中心教材编审中心.《建设工程技术与计量》.中国计划出版社.2004 |
[3] |
廖天平. 《建筑工程造价管理》. 重庆大学. 2003 |
[4] |
沈洁, 戴望炎, 钱昆润.《建筑工程定额与预算》.东南大学出版社.2002 |
[5] |
赵丰东, 乔渊, 冯蕾, 杨威, 马振珠.《北京市绿色建筑评价技术指南》.中国建材工业出版社, 2013.04 |
[6] |
王冬松, 杨国平.《建筑对象数字化定义》.中国标准出版社.2007, 11 |
Metrics
- PDF Downloads(17)
- Abstract views(1301)
- HTML views(1055)