Citation: Li Dan. Design Control of High-level Accomplished Projects :BIM-based Design Practice of Sanya Forum Permanent Site. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(2): 1-5. doi: 10.16670/j.cnki.cn11-5823/tu.2016.02.01
2016, 8(2): 1-5. doi: 10.16670/j.cnki.cn11-5823/tu.2016.02.01
Design Control of High-level Accomplished Projects :BIM-based Design Practice of Sanya Forum Permanent Site
Guangzhou Design Institute, Guangzhou 510620, China |
With novel design and unique shape, Sanya Forum Permanent Site Project aims to meet the requirements of the highest level of domestic and international political and financial conference of exhibition, which is of high design as well as implementation difficulty. This article comprehensively and systematically introduces the organization mode and application of BIM-based design in this project. From the primary design to later period of construction cooperation, BIM-based design plays an irreplaceable role in the process of coping with civil engineering location and comprehensive pipeline design of complicated form. Especially when confronting with the most complex curtain wall system without mathematical rules, BIM renders to the close combination of design, production and construction and works effectively. Meanwhile, BIM-based design optimizes internal clear height green building-related design. The final completion also shows that BIM-based design not only completes the design task successfully, but also reaches high-level accomplishments.
[1] |
王宇, 常茜.工欲善其事, 必先利其器——BIM实践案例及经验体会[J].建筑学报, 2011(06):101-104.doi: 10.3969/j.issn.0529-1399.2011.06.017 |
[2] |
葛清主编.BIM第一维度——项目不同阶段的BIM应用[M].中国建筑工业出版社, 2013. |
[3] |
葛兰文主编.BIM第二维度——项目不同参与方的BIM应用[M].中国建筑工业出版社, 2011. |
[4] |
欧特克软件(中国)有限公司.可持续设计分析和建筑信息模型[M].上海:第三届工程建设计算机应用创新论坛论文集, 2011:348-357. |
[5] |
傅筱.一种相对关系的推敲——BIM作为建筑构思和深化的设计工具[J].时代建筑, 2013(02):26-29.doi: 10.3969/j.issn.1005-684X.2013.02.006 |
[6] |
任爱珠.从"甩图板"到BIM——设计院的重要作用[J].土木工程信息技术, 2014, 6(1):1. |
[7] | |
[8] |
陈剑佳, 焦柯, 杨远丰.基于Revit建筑结构施工图表达的实用方法[J].土木工程信息技术, 2015, 7(5):128-34. |
[9] |
何永祥, 潘志广, 黄世超.BIM技术在施工图绘制中的应用研究[J].土木建筑工程信息技术, 2013, 5(2):15-22. |
[10] |
曾旭东, 王大川, 陈辉.参数化建模[M].湖北:华中科技大学出版社, 2011. |
Metrics
- PDF Downloads(16)
- Abstract views(1919)
- HTML views(822)