Citation: Bing Cui, Yue Yin, Shun Li. Application of BIM Technology in the Construction of Pre-Heater Tower in Cement Plant. Journal of Information Technologyin Civil Engineering and Architecture, 2021, 13(4): 46-52. doi: 10.16670/j.cnki.cn11-5823/tu.2021.04.07
2021, 13(4): 46-52. doi: 10.16670/j.cnki.cn11-5823/tu.2021.04.07
Application of BIM Technology in the Construction of Pre-Heater Tower in Cement Plant
1. | College of Management and Economics, Tianjin University, Tianjin 300072, China |
2. | School of Civil Engineering, Tianjin University, Tianjin 300350, China |
3. | Tianjin Cement Industry Design & Research Institute Co., Ltd., Tianjin 300400, China |
As a typical industrial building structure in cement plant, the pre-heater tower has the characteristics of complex pipeline distribution and dense equipment layout. In this paper, the application of BIM technology in the construction of the pre-heater tower was discussed and evaluated from three aspects of design, construction and information management platform. In the design phase, BIM technology mainly plays the role of domains collaboration, collision detection and rapid calculation of engineering quantity. In the construction phase, the construction site layout and construction sequence were optimized to avoid spatial conflicts. Based on BIM technology, an information management platform could be developed through an external database and a lightweight collaboration platform to achieve information integration and sharing.
[1] | |
[2] |
Sacks R, Eastman C, Lee G, et al. BIM handbook[M]. Third Edition. Wiley, 2011. |
[3] | |
[4] |
Han N, Yue Z F, Lu Y F. Collision Detection of Building Facility Pipes and Ducts Based on BIM Technology[J]. Advanced Materials Research, 2011, 346: 312-317.doi: 10.4028/www.scientific.net/AMR.346.312 |
[5] |
杨科, 康登泽, 车传波, 等. 基于BIM的碰撞检查在协同设计中的研究[J]. 土木建筑工程信息技术, 2013, 5(4): 71-75.doi: 10.3969/j.issn.1674-7461.2013.04.015 |
[6] |
Volk R, Stengel J, Schultmann F. Building Information Modeling(BIM)for existing buildings—Literature review and future needs[J]. Automation in Construction, 2014, 38: 109-127.doi: 10.1016/j.autcon.2013.10.023 |
[7] |
陈菁, 余芳强, 杨杰, 等. 基于BIM的工程计量与数据交换应用研究[J]. 土木建筑工程信息技术, 2018, 10(3): 80-85. |
[8] |
王茹, 方超, 王柳舒. 基于我国清单计价规范的Revit模型工程量提取[J]. 图学学报, 2017, 38(3): 447-452. |
[9] |
李飞, 刘宇恒, 杨成, 等. 基于BIM技术的施工场地布置研究与应用[J]. 土木建筑工程信息技术, 2017, 9(1): 60-64. |
[10] |
李犁, 邓雪原. 基于BIM技术的建筑信息平台的构建[J]. 土木建筑工程信息技术, 2012, 4(2): 25-29. |
Metrics
- PDF Downloads(24)
- Abstract views(1928)
- HTML views(1232)