Citation: Cai Lianwei, Xu Zihao, Zhu Jin, Guo Ruifeng, Lin Lisi, Jiang Yueju. The Application of BIM in the Project of Ping′an International Finance Center South Tower Construction Management. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(1): 35-39. doi: 10.16670/j.cnki.cn11-5823/tu.2017.01.06
2017, 9(1): 35-39. doi: 10.16670/j.cnki.cn11-5823/tu.2017.01.06
The Application of BIM in the Project of Ping′an International Finance Center South Tower Construction Management
1. | China Construction First Division Group Construction & Development Co., Ltd., Beijing 100102, China |
2. |
With the rapid growth of economy and the progress of science and technology, modern information technology has been widely used in industrial production as well as daily life. The projects of super high-rise buildings involve large investment, long period of construction, participation of numerous contractors and complexity in construction management. In the principal contract management, the traditional way of information communication and management couldn′t meet the requirements. As principal contractor, we adopted the BIM methodology to help us to manage the complexity. This paper takes the project of South Tower, Pingan International Finance Center as case study. It describes the initial phase of the BIM organization and planning, the construction of the BIM application environment and the application of BIM technology in the high-rise construction management. It demonstrates how the management challenges were met through the integration of design and construction with BIM based solutions.
[1] |
National Institute of Standards and Technology.2009, 4:13. |
[2] |
中建《建筑工程施工BIM应用指南》编委会, 中国建筑工业出版社. |
[3] |
曹铭. 基于IFC标准的建筑工程信息集成及4D施工管理研究[D]. 北京: 清华大学土木工程系, 2005. |
[4] | |
[5] |
陈倩, 张原.浅谈BIM技术及其应用[J].价值工程, 2012, 23.doi: 10.3969/j.issn.1006-4311.2012.12.257 |
Metrics
- PDF Downloads(42)
- Abstract views(2694)
- HTML views(1154)