2019, 11(2): 34-40. doi: 10.16670/j.cnki.cn11-5823/tu.2019.02.06
无锡万达室外主题乐园项目设计阶段BIM应用
1. | 北京互联立方技术服务有限公司,北京 100070 |
2. | 万达文化旅游规划研究院有限公司,北京 100022 |
BIM Application in the Design Stage of Wuxi Wanda Outdoor Theme Park
1. | Beijing ISBIM Technology Service Co., Ltd., Beijing 100070, China |
2. | Wanda Cultural Tourism Planning & Research Institute Co., Ltd., Beijing 100022, China |
引用本文: 孟艳吉, 王海斌, 张杨. 无锡万达室外主题乐园项目设计阶段BIM应用[J]. 土木建筑工程信息技术, 2019, 11(2): 34-40. doi: 10.16670/j.cnki.cn11-5823/tu.2019.02.06
Citation: Meng Yanji, Wang Haibin, Zhang Yang. BIM Application in the Design Stage of Wuxi Wanda Outdoor Theme Park[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(2): 34-40. doi: 10.16670/j.cnki.cn11-5823/tu.2019.02.06
摘要:主题乐园与常规民用建筑相比,具有占地面积大、建筑类型多、涉及专业广等特点,需要引入BIM技术解决常规二维设计无法解决的问题。本文主要从基于BIM的大型假山辅助设计,进行方案推敲与多专业协调; 针对复杂游艺单体,以游客视角进行沉浸式体验分析,对投影设备路线进行模拟,优化土建设计和包装设计,确保座位布置合理; 对入口区仿古建筑进行精细化模型创建,利用BIM模型进行人视角漫游分析,辅助建设单位进行设计决策; 考虑园区整体性,对市政管线、单体空间关系、花车巡游路线、设备运转安全等方面进行分析,保证游客的游园感受; 运用BIM技术,全员参与,协调全专业,综合考虑美观、功能与安全等因素,确保设计问题得到充分思考、妥善解决,提升效果品质。
Abstract: Compared with conventional civil buildings, theme park projects possess characteristics of large area, numerous types of buildings, and involving a wide range of specialties, so it is necessary to introduce BIM technology to solve problems that cannot be solved through conventional 2D design methods. Taking a BIM-based large-scale rockery design as an example, this paper carries out the project deliberation and multi-professional coordination. For complex entertainment units, immersive experience is carried out from the perspective of visitors, the projection equipment routes is simulated, the civil engineering design and packaging design are optimized, and the seating arrangement is ensured to be reasonable. Fine model of archaic buildings in the entrance area is established, and BIM model is used to roam through the human perspective to assist the construction units in making design decisions. Considering the integrity of the park, this paper also analyses the municipal pipeline, the spatial relationship of the individual, the tour route of the float, and the safety of the equipment operation, so as to ensure the best visitors'feeling of the park. Through applying the BIM technology, full participation, and coordination of professional measures, and considering of aesthetic, functional and safety factors comprehensively, design problems are fully considered and properly solved, which certainly improves the quality of the effect.
[1] |
庞学雷.试论BIM应用评价与效益评价:基于BIM的上海国际旅游度假区项目管理探索之三[J].建筑科技, 2016(8): 92-94. |
[2] |
王勇, 李久林, 张建平.建筑协同设计中的BIM模型管理机制探索[J].土木建筑工程信息技术, 2014, 6(6): 64-69.doi: 10.3969/j.issn.1674-7461.2014.06.012 |
[3] |
王承, 梁铭, 彭杰, 等.三维技术下的建筑精确设计——以长沙冰雪世界项目为例[J].土木建筑工程信息技术, 2017, 9(5): 1-9. |
[4] | |
[5] |
张军, 朱贺, 魏树臣, 等. 3D打印模型及BIM模型Web嵌入应用[J].土木建筑工程信息技术, 2017, 9(3): 58-62. |
[6] |
王茹, 张祥, 韩婷婷.基于BIM的古建筑构件信息的标准化及量化提取研究[J].土木建筑工程信息技术, 2014, 6(1): 25-28.doi: 10.3969/j.issn.1674-7461.2014.01.005 |
[7] |
左伦源, 周伟光, 韩冰. 2019年中国北京世界园艺博览会中国馆项目工程施工BIM深度应用[J].土木建筑工程信息技术, 2018, 10(6): 39-43. |
[8] |
张灿, 李万章, 韩小鹏, 等. BIM在建筑施工中的深度应用——2019年中国北京世界园艺博览会生活体验馆工程[J].土木建筑工程信息技术, 2019, 11(1): 9-18. |
[9] |
高远, 邓雪原.基于BIM的建筑MEP设计技术研究[J].土木建筑工程信息技术, 2010, 2(2): 91-96.doi: 10.3969/j.issn.1674-7461.2010.02.018 |
[10] |
杜伸云, 梁昊.无人机倾斜摄影实景建模技术在施工中的应用[J].土木建筑工程信息技术, 2018, 10(2): 72-77. |
[11] |
何清华, 钱丽丽, 段运峰, 等. BIM在国内外应用的现状及障碍研究[J].工程管理学报. 2012, 26(1): 12-16.doi: 10.3969/j.issn.1674-8859.2012.01.003 |
[12] |
李久林.智慧建造理论与实践[M].中国建筑工业出版社. 2015. |
计量
- PDF下载量(36)
- 文章访问量(2388)
- HTML全文浏览量(811)