• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Zhang Feiting, Wang Cheng, Liang Ming, Wu Wei, Wang Hao. Application and Discussion of BIM+FM Technology—Taking the Zhongjian Square Project as Example. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(4): 19-25. doi: 10.16670/j.cnki.cn11-5823/tu.2017.04.04

2017, 9(4): 19-25. doi: 10.16670/j.cnki.cn11-5823/tu.2017.04.04

Application and Discussion of BIM+FM Technology—Taking the Zhongjian Square Project as Example

1. 

1CSC Dongfu Group, Shanghai 200122, China

2. 

East China Architectural Design & Research Institute Co., Ltd., Shanghai 200041, China

Web Publishing Date: 2017-08-01

[1]

汪再军.BIM技术在建筑运维管理中的应用[J].建筑经济, 2013(9):94-97. 

[2]

陈光军, 张慧君, 吕冰冰.BIM技术在项目运维阶段的应用研究[J].中州大学报, 2016, 33(4). 

[3]

冯延力. 基于BIM的设施运维管理系统的开发与应用, 第五届工程建设计算机应用创新论坛论文集.

[4]

IFMA.(2009)International Facility Management Association(IFMA).

[5]

施晨欢, 王凯, 李嘉军, 等.基于BIM的FM运维管理平台研究-申都大厦运维管理平台应用实践[J].土木建筑工程信息技术, 2014, 6(6):50-57. 

Metrics
  • PDF Downloads(48)
  • Abstract views(2502)
  • HTML views(1007)
Catalog

Figures And Tables

Application and Discussion of BIM+FM Technology—Taking the Zhongjian Square Project as Example

Zhang Feiting, Wang Cheng, Liang Ming, Wu Wei, Wang Hao

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn