2018, 10(2): 104-110. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.21
拆迁管理信息化系统及其在杨泗港长江大桥项目中的应用研究
1. | 华中科技大学 a. 土木工程与力学学院;b. 湖北省数字建造与安全工程技术研究中心,武汉 430074 |
2. | 武汉天兴洲道桥投资开发有限公司,武汉 430074 |
Research on Demolition Management Information System and it′s Application in Yangsigang Yangtze River Bridge
1. | a.Hubei Engineering Research Center for Digital Construction and Safety; b.School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 430074, China |
2. | Wuhan Tian-xing-zhou Bridge Investment Development Co., Ltd., Wuhan 430074, China |
引用本文: 覃亚伟, 刘晟, 马文瑾, 龚成, 张柯. 拆迁管理信息化系统及其在杨泗港长江大桥项目中的应用研究[J]. 土木建筑工程信息技术, 2018, 10(2): 104-110. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.21
Citation: Qin Yawei, Liu Sheng, Ma Wenjin, Gong Cheng, Zhang Ke. Research on Demolition Management Information System and it′s Application in Yangsigang Yangtze River Bridge[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(2): 104-110. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.21
摘要:本文首先阐述了基础设施建设中拆迁管理的特点和意义,通过分析拆迁管理的主要业务和功能需求,提出构建基于BIM的拆迁管理信息系统,分析了其系统建设的目标、内容和结构。最后结合杨泗港长江大桥拆迁管理信息系统,充分说明了基于BIM的拆迁管理方法的优越性和先进性为类似的建设项目中拆迁管理工作提供了有益借鉴。
Abstract: This paper firstly elaborates the features and significance of demolition management in infrastructure construction.By analyzing the main business and functional requirements of the demolition management system, this paper puts forward the demolition management based on BIM.Its goal, content and structure has been analyzed in the paper.Finally, with the demolition management module in Yang Si Gang Bridge Demolition Management Information System.The superiority and advanced nature of the demolition management method based on BIM have been illustrated sufficiently.It provides a useful reference for the demolition management in similar construction projects.
[1] | |
[2] | |
[3] | |
[4] | |
[5] | |
[6] | |
[7] |
梅新和, 高娃.房屋拆迁安置操作实务[M].北京:法律出版杜, 2007. |
[8] | |
[9] |
单震雷. 城市房屋拆迁与房源管理系统的设计与实现[D]. 电子科技大学, 2011. |
[10] | |
[11] |
Jack C.P., Lauren Y.H.A BIM-based system for demolition and renovation waste estimation and planning[J].Waste Management, 2013, 33(6): 1539-1551.doi: 10.1016/j.wasman.2013.01.001 |
[12] |
Beijia Huang, etc.Construction and demolition waste management in China through the 3R principle[J].Resources Conservation and Recycling, 2016, 129: 36-44. |
[13] | |
[14] | |
[15] |
Fritz, Kleemann, etc. Using change detection data to assess amount and composition of demolition waste from buildings in Vienna[J]. Resources Conservation and Recycling, 2016, 123. |
计量
- PDF下载量(25)
- 文章访问量(2959)
- HTML全文浏览量(1052)