Citation: Wu Jiming, Ni Chen. Interaction and Integration—BIM and the Traditional Way of Construction. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(3): 22-27.
2015, 7(3): 22-27.
Interaction and Integration—BIM and the Traditional Way of Construction
Beijing Institute of Architectural Design(BIAD), Beijing 100045, China |
BIM and the traditional way of construction have different emphasis and advantages in different stages of design. In every stage of design for solving various problems, a reasonable and comprehensive use of design tools or software will greatly enhance our productivity. In order to integrate theory with practice, according to our actual experience in the projects of Xinzhou Planning Hall, Museum and Archives, we come up with an integrated constructive logic from the perspective of an architect. Through this summary, we hope to bring some enlightenment to the design of this type of project.
Metrics
- PDF Downloads(11)
- Abstract views(1236)
- HTML views(653)