• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Guanpei He. What are the Key Issues for Different Type AECO Firms to Adopt BIM at this Stage?. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(1): 9-13.

2014, 6(1): 9-13.

What are the Key Issues for Different Type AECO Firms to Adopt BIM at this Stage?

Ubiquitous Technology Co., Ltd., Guangzhou 510630, China

Web Publishing Date: 2014-02-01

[1]

BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors by Chuck Eastman, Paul Teicholz, Rafael Sacks and Kathleen Liston (Apr 19, 2011)

[2]

何关培谈BIM博客, http://blog.sina.com.cn/heguanpei

[3]

美国国家BIM标准第二版官方网站: http://www.wbdg.org/bim/bim.php

[4]

美国建筑科学研究院官方网站: http://www.nibs.org/

[5]

美国buildingSMART联盟官方网站: http://www.buildingsmartalliance.org/

[6]

buildingSMART国际网站, http://www.buildingsmart.org/ (通过该网站可以访问各个国家和地区的buildingSMART联盟官方网站)

[7]

K. Pramod Reddy, BIM for building owners and developers

[8]

王新微博: http://weibo.com/bimclubchina

[9]

何关培主编或执笔: 《中国商业地产BIM应用研究报告2010》、《中国工程建设BIM应用研究报告2011》、《施工企业BIM应用研究报告2012》、《施工企业BIM应用研究报告2013》

Metrics
  • PDF Downloads(11)
  • Abstract views(1453)
  • HTML views(791)
Catalog

Figures And Tables

What are the Key Issues for Different Type AECO Firms to Adopt BIM at this Stage?

Guanpei He

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn