Citation: Guanpei He. What are the Key Issues for Different Type AECO Firms to Adopt BIM at this Stage?. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(1): 9-13.
2014, 6(1): 9-13.
What are the Key Issues for Different Type AECO Firms to Adopt BIM at this Stage?
Ubiquitous Technology Co., Ltd., Guangzhou 510630, China |
Owner, architecture/engineering firm and constructor are three main players in BIM adoption. There are different key issues for different type enterprises during different stages. The paper provides following views after analyzing current BIM adoption situation in China. The key issue for owner is to build its' own team's BIM capability, A/E firm is to manage right BIM uses and investment size, and constructor is to standardize and popularize mature BIM uses.
[1] |
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors by Chuck Eastman, Paul Teicholz, Rafael Sacks and Kathleen Liston (Apr 19, 2011) |
[2] |
何关培谈BIM博客, http://blog.sina.com.cn/heguanpei |
[3] |
美国国家BIM标准第二版官方网站: http://www.wbdg.org/bim/bim.php |
[4] |
美国建筑科学研究院官方网站: http://www.nibs.org/ |
[5] |
美国buildingSMART联盟官方网站: http://www.buildingsmartalliance.org/ |
[6] |
buildingSMART国际网站, http://www.buildingsmart.org/ (通过该网站可以访问各个国家和地区的buildingSMART联盟官方网站) |
[7] |
K. Pramod Reddy, BIM for building owners and developers |
[8] | |
[9] |
何关培主编或执笔: 《中国商业地产BIM应用研究报告2010》、《中国工程建设BIM应用研究报告2011》、《施工企业BIM应用研究报告2012》、《施工企业BIM应用研究报告2013》 |
Metrics
- PDF Downloads(11)
- Abstract views(1453)
- HTML views(791)