Citation: Meng Lingxiao. BIM Application of the National Oceanographic Museum. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(1): 50-55. doi: 10.16670/j.cnki.cn11-5823/tu.2017.01.09
2017, 9(1): 50-55. doi: 10.16670/j.cnki.cn11-5823/tu.2017.01.09
BIM Application of the National Oceanographic Museum
China Construction Eighth Engineering Tianjin Division Co., Ltd., Tianjin 300450, China |
Building Information Modeling (BIM) technology is more and more popular today, more and more projects howe used BIM technology. The design and construction process of the National Oceanographic Museum were guided by the BIM modeling which provided by design institute. As the construction of the project, our team adopted new organizational structure and management mode, guided the construction by the BIM model, applied all kinds of information and functions of BIM model deeply in the process of construction, integrated all the construction professionals, designers, owners, contractors. In construction process, we effectively avoided many conventional problems, also saved the cost and time for the project.
[1] |
刘占省, 赵雪锋. BIM技术与施工项目管理[M].北京:中国电力出版社, 2015. |
[2] |
李邵建.欧特克BIM标准丛书: BIM纲要[M].天津:同济大学出版社, 2015. |
[3] |
柏慕进业. Autodesk Revit Architecture 2016官方标准教程[M].北京:电子工业出版社, 2016. |
[4] |
Kensek, Karen. Building Information Modeling: Bim in Current and Future Practice[M].美国: John Wiley & Sons, 2014. |
[5] |
Metrics
- PDF Downloads(31)
- Abstract views(2079)
- HTML views(890)