Citation: Feng Zhao, Gang Liu. Research and Development of Intelligent Installation System Based on BIM and Laser Scanning Point Cloud Technology. Journal of Information Technologyin Civil Engineering and Architecture, 2021, 13(4): 23-29. doi: 10.16670/j.cnki.cn11-5823/tu.2021.04.04
2021, 13(4): 23-29. doi: 10.16670/j.cnki.cn11-5823/tu.2021.04.04
Research and Development of Intelligent Installation System Based on BIM and Laser Scanning Point Cloud Technology
1. | Zhejiang Construction Investment Group Co., Ltd., Hangzhou 310012, China |
2. | Zhejiang Construction Engineering Group Co., Ltd., Hangzhou 310012, China |
Through the research of 3D laser scanning control network, the point cloud data collection and the point cloud data processing, this paper compares and verifies the real-time point cloud model with the construction BIM model, develops a prefabricated building intelligent construction and installation system based on BIM and IoT. It also establishes a demonstration project pilot to take the actual project application results as feedback which will optimize the existing management methods and construction technology, reduce the installation deviation and improve the quality of engineering.
[1] |
谢晓晨. 论我国建筑业BIM应用现状和发展[J]. 土木建筑工程信息技术, 2014, 6(6): 90-101.doi: 10.3969/j.issn.1674-7461.2014.06.017 |
[2] |
王丰碑, 黄鹏. BIM技术助力既有建筑改造项目提质增效[J]. 土木建筑工程信息技术, 2017, 9(4): 37-40. |
[3] | |
[4] |
李小飞, 李赟, 张林, 等. 基于三维激光扫描的BIM技术在上海世茂深坑酒店方案优化中的应用[J]. 施工技术, 2015(19): 30-33. |
[5] |
孙文, 刘赟, 杨全兵. 基于BIM技术及三维激光扫描技术的古建筑修复保护研究[J]. 中国建材科技, 2019, 28(3): 144-145. |
[6] |
韩达光, 秦国成, 周银, 等. 基于BIM和三维激光扫描在基坑监测中的应用[J]. 重庆交通大学学报(自然科学版), 2019, 38(6): 72-76, 102.doi: 10.3969/j.issn.1674-0696.2019.06.13 |
[7] |
阚浩钟, 闫振海, 李湛, 等. 基于BIM和三维激光扫描的钢管拱肋拼装检测技术[J]. 施工技术, 2019, 48(6): 20-24. |
[8] |
覃亚伟, 石文洁, 肖明钊. 基于BIM+三维激光扫描技术的桥梁钢构件工程质量管控[J]. 土木工程与管理学报, 2019, 36(4): 119-125. |
[9] |
廖羚, 莫专恒, 杨磊, 等. BIM技术在南宁轨道交通3号线创业路站的机电工程施工研究应用[J]. 土木建筑工程信息技术, 2019, 11(5): 7-18. |
Metrics
- PDF Downloads(63)
- Abstract views(2031)
- HTML views(1529)