Citation: Chen Jiayue, Chen Liangzhi, Qian Yuanming. Research and Application of BIM Technology in Lekki Deepwater Port Project in Nigeria. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(5): 10-14. doi: 10.16670/j.cnki.cn11-5823/tu.2017.05.02
2017, 9(5): 10-14. doi: 10.16670/j.cnki.cn11-5823/tu.2017.05.02
Research and Application of BIM Technology in Lekki Deepwater Port Project in Nigeria
CCCC-Fourth Harbor Design Institute Engineering Co., Ltd., Guangzhou 510230, China |
In response to the multi-subject cooperative design, tight schedule and high difficulty in the design of the Lekki deepwater port project in Nigeria, the BIM technology research on port engineering collaborative design has been carried out.Autodesk Vault platform is used to integrate various software and file formats for collaborative design.The conclusion is drawn that BIM technology in port engineering can achieve cooperative design, pipeline integration, deepening design, and etc., which can effectively improve the quality and efficiency of port engineering design, reduce the problems such as "mistake and miss" in the design process, and reduce the project cost.As a conclusion, BIM application should the main direction and trend of design engineering.
[1] |
胡振中, 彭阳, 田佩龙.基于BIM的运维管理研究与应用综述[J].图学学报, 2015, 36(5):802-810.doi: 10.11996/JG.j.2095-302X.2015050802 |
[2] | |
[3] | |
[4] | |
[5] |
隋振国, 马锦明, 陈东, 徐伟.BIM技术在土木工程施工领域的应用进展[J].施工技术, 2013, 42(s2):161-165. |
[6] |
张连营, 李彦伟, 高源.BIM技术的应用障碍及对策分析[J].土木工程与管理学报, 2013, 30(03):65-69+85. |
[7] | |
[8] | |
[9] |
满庆鹏, 李晓东.基于普适计算和BIM的协同施工方法研究[J].土木工程学报, 2012, 45(S2):311-315. |
[10] |
张建平, 余芳强, 李丁.面向建筑全生命期的集成BIM建模技术研究[J].土木建筑工程信息技术, 2012, 4(1):6-14. |
[11] |
Metrics
- PDF Downloads(37)
- Abstract views(2665)
- HTML views(1030)