Citation: Ma Zhiliang, Ma Jiankun. IPD and the Adoption of BIM in it. Journal of Information Technologyin Civil Engineering and Architecture, 2011, 3(4): 36-41.
2011, 3(4): 36-41.
IPD and the Adoption of BIM in it
Department of Civil Engineering, Tsinghua University, Beijing 100084, China |
As a new method of project delivery, IPD(Integrated Project Delivery) has already been widely used and gradually matured in the practice of several developed countries, e.g.USA, Australia and Britain.However, its application in China is still a blank field.The method itself still has several problems, e.g.the fuzzy definition, the lack of the legal and contract system.The emergence of BIM technology has facilitated the development of IPD.In this paper, based on a thorough literature review, the evolutionary of IPD was reviewed firstly, and then the definition, characteristics and the key point of IPD was summarized, followed by the major problems for the application of IPD in China.Finally, the adoption of BIM in solving current problems and promoting the efficiency of IPD was analyzed.The findings reported in this paper are expected to be beneficial to the application of IPD in China.
[1] |
David C.Kent, Burcin Becerik Gerber.understanding construction industry experience and attitudes toward integrated project delivery[J].Journal of construction engineering and management.2010, 136(8):815-825.doi: 10.1061/(ASCE)CO.1943-7862.0000188 |
[2] |
F.Pena Mora, M.Li.Dynamic Planning and Control Methodology for Design/Build Fast-track Construction Project[J].Journal of Construction Engineering and Management.2001, 127(1):1-17.doi: 10.1061/(ASCE)0733-9364(2001)127:1(1) |
[3] |
The Department of Treasury and Finance. In Pursuit of Additional Value[OL]. (2009. 10)[2011. 5. 28] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing. |
[4] |
The Construction Management Association of America(CMAA). Managing Integrated Project Delivery[OL]. (2010. 10)[2011. 5. 28]http://cmaanet.org/. |
[5] |
Chris Noble.Can project alliancing agreements change the way we build?[J].Journal of Architectural Record.2007, (7):16-23. |
[6] |
U. S. General Service Administration(GSA). Partnering[OL]. (2010. 10. 20)[2011. 05. 11]http://www.gsa.gov/portal/content/100822. |
[7] |
The Department of Treasury and Finance. Victorian Policy for Alliance Contracting[OL]. (2010. 07)[2011. 05. 11] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing. |
[8] |
The Associated General Contractors of America(AGC). IPD for Public and Private Owners[OL]. (2010. 01)[2011. 06. 10] http://www.agc.org/. |
[9] |
The Associated General Contractors of America(AGC). Integrated Project Delivery: First Principles for Owners and Teams[OL]. (2007. 07)[2011. 04. 07] http://www.agc.org/. |
[10] |
Amy C. Edmondson, Faaiza Rashid. Integrated Project Delivery at Autodesk, Inc. (C)[J]. Journal of Harvard business school. 2009, (9): 29-37. |
[11] |
The American Institute of Architects(AIA). Integrated Project Delivery: A Guide[OL]. (2007. 9)[2011. 03. 08] http://www.msaipd.com/IPD_Guide_2007.pdf. |
[12] |
The American Institute of Architects(AIA). Integrated Project Delivery(IPD) Family, Contract Documents[OL]. (2010. 08)[2011. 03. 08]http://www.aia.org/index.htm. |
[13] |
Jilei Wang. Integrated Project Delivery-Achieving Relational Contracting through Traditional Project Management Methods[D/OL]. (2008. 07. 14)[2011. 05. 06] http://etd.ohiolink.edu/view.cgi/WANG%20JILEI.pdf?ucin1218820957. |
[14] |
The American Institute of Architects(AIA). AIA C191-2009 Frequently Asked Questions[OL]. (2011. 02. 09)[2011. 05. 08]http://www.aia.org/index.htm. |
[15] |
The Associated General Contractors of America(AGC). ConsensusDOCS 300 Guidebook[OL]. (2011. 07)[2011. 08. 08]http://www.agc.org/. |
[16] |
Kermanshachi.US multi-party standard partnering contract for integrated project delivery[J].Journal of Masters Abstracts International.2010, 48(6):174-185. |
[17] |
U. S. General Service Administration(GSA). 3D-4D Building Information Modeling[OL]. (2011. 03)[2011. 05. 08]http://www.gsa.gov/portal/category/21062. |
[18] |
National Institute of Building Science. National Building Information Modeling Standard[OL]. [2011. 09. 03]http://www.wbdg.org/bim/nbims.php. |
[19] |
Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston. BIM Handbook[OL]. [2011. 09. 03] http://books.google.com/books?id=IioygN0nYzMC&hl=zh-CN. |
[20] |
Fish, Amanda. Integrated project delivery the obstacles of implementation[OL]. (2011. 05)[2011. 08. 08]http://krex.k-state.edu/dspace/handle/2097/8554. |
[21] |
The American Institute of Architects(AIA). 2008AIA Documents Advance the Use of BIM and IPD[OL]. (2008. 06)[2011. 05. 08]http://www.aia.org/index.htm. |
[22] |
The Associated General Contractors of America(AGC). Contracts Catalog[OL]. (2011. 07)[2011. 09. 03]http://www.agc.org/. |
[23] |
Nadine M.Leonidas.Integrated-Project-Delivery Boosters Ignore Many Flashing Red Lights[J].Journal of Engineering News-Record(ENR).2010, 264(14):22-24. |
[24] |
Reza Ghassemi.Transitioning to Integrated Project Delivery-Potential barriers and lessons learned[J].Journal of Lean Construction Journal.2011, (1):32-52. |
[25] |
Islam.H.El-adaway.Integrated Project Delivery Case Study Guidelines for Drafting Partnering Contract[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction.2010, 2(4):248-254.doi: 10.1061/(ASCE)LA.1943-4170.0000024 |
[26] |
Stephen A.Hilger.The Legal Worries Raised by IPD[J].Journal of Engineering News-Record(ENR).2010, 264(30):12-19. |
[27] |
Pardis B. Pishdad. Integrating Multi-Party Contracting Risk Management(MPCRM) Model with Building Information Modeling(BIM)[OL]. (2010. 08)[2011. 08. 08]http://itc.scix.net/data/works/att/w78-2010-44.pdf. |
[28] |
Leentje Volker.architect participation in integrated project delivery-the future mainspring of architectural design firms[J].Journal of Gest?o & Tecnologia de Projetos.2010, 5(3):22-37. |
[29] |
W. Nofera, S. Korkmaz., V. Miller. Innovative Features of Integrated Project Delivery Shaping Project Team Communication. Proceedings of Engineering Project Organizations Conference, Estes Park[C]. USA 2010. |
[30] |
The American Institute of Architects(AIA). Crossing the IPD Chasm with BIM[OL]. (2010. 10)[2011. 05. 08]http://www.aia.org/index.htm. |
[31] |
Franklin D. Lancaster. Integrated Project Delivery-Next-Generation BIM for Structural Engineering. Proceedings of 2010 Structures Congress?2010 ASCE, Washington, DC[C]. USA 2010. |
[32] |
The Department of Treasury and Finance. The Practitioners' Guide to Alliance Contracting[OL]. (2010. 10. 25)[2011. 05. 08] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing. |
[33] |
Ryan E.Smith.Lean and Integrated Project Delivery[J].Journal of Lean Construction.2011, (1):1-16. |
[34] |
Howard Mckew.INTEGRATED-Project Delivery.[J] Journal of Engineered Systems.2009, 26(1):108-118. |
[35] |
Guangbin Wang. Cooperation between Building Information Modeling and Integrated Project Delivery Method Leads to Paradigm Shift of AEC Industry. Proceedings of the 2009 International Conference on Management and Service Science(MASS)[C]. USA 2009. |
Metrics
- PDF Downloads(15)
- Abstract views(1588)
- HTML views(1249)