• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Ma Zhiliang, Ma Jiankun. IPD and the Adoption of BIM in it. Journal of Information Technologyin Civil Engineering and Architecture, 2011, 3(4): 36-41.

2011, 3(4): 36-41.

IPD and the Adoption of BIM in it

Department of Civil Engineering, Tsinghua University, Beijing 100084, China

Web Publishing Date: 2011-12-01

Fund Project: 国家自然科学基金项目资助课题“基于BIM技术的建筑工程IPD网络平台研究” 51078201国家自然科学基金项目资助课题“基于BIM技术的建筑工程IPD网络平台研究”(51078201)

[1]

David C.Kent, Burcin Becerik Gerber.understanding construction industry experience and attitudes toward integrated project delivery[J].Journal of construction engineering and management.2010, 136(8):815-825.doi: 10.1061/(ASCE)CO.1943-7862.0000188

[2]

F.Pena Mora, M.Li.Dynamic Planning and Control Methodology for Design/Build Fast-track Construction Project[J].Journal of Construction Engineering and Management.2001, 127(1):1-17.doi: 10.1061/(ASCE)0733-9364(2001)127:1(1)

[3]

The Department of Treasury and Finance. In Pursuit of Additional Value[OL]. (2009. 10)[2011. 5. 28] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing.

[4]

The Construction Management Association of America(CMAA). Managing Integrated Project Delivery[OL]. (2010. 10)[2011. 5. 28]http://cmaanet.org/.

[5]

Chris Noble.Can project alliancing agreements change the way we build?[J].Journal of Architectural Record.2007, (7):16-23.

[6]

U. S. General Service Administration(GSA). Partnering[OL]. (2010. 10. 20)[2011. 05. 11]http://www.gsa.gov/portal/content/100822.

[7]

The Department of Treasury and Finance. Victorian Policy for Alliance Contracting[OL]. (2010. 07)[2011. 05. 11] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing.

[8]

The Associated General Contractors of America(AGC). IPD for Public and Private Owners[OL]. (2010. 01)[2011. 06. 10] http://www.agc.org/.

[9]

The Associated General Contractors of America(AGC). Integrated Project Delivery: First Principles for Owners and Teams[OL]. (2007. 07)[2011. 04. 07] http://www.agc.org/.

[10]

Amy C. Edmondson, Faaiza Rashid. Integrated Project Delivery at Autodesk, Inc. (C)[J]. Journal of Harvard business school. 2009, (9): 29-37.

[11]

The American Institute of Architects(AIA). Integrated Project Delivery: A Guide[OL]. (2007. 9)[2011. 03. 08] http://www.msaipd.com/IPD_Guide_2007.pdf.

[12]

The American Institute of Architects(AIA). Integrated Project Delivery(IPD) Family, Contract Documents[OL]. (2010. 08)[2011. 03. 08]http://www.aia.org/index.htm.

[13]

Jilei Wang. Integrated Project Delivery-Achieving Relational Contracting through Traditional Project Management Methods[D/OL]. (2008. 07. 14)[2011. 05. 06] http://etd.ohiolink.edu/view.cgi/WANG%20JILEI.pdf?ucin1218820957.

[14]

The American Institute of Architects(AIA). AIA C191-2009 Frequently Asked Questions[OL]. (2011. 02. 09)[2011. 05. 08]http://www.aia.org/index.htm.

[15]

The Associated General Contractors of America(AGC). ConsensusDOCS 300 Guidebook[OL]. (2011. 07)[2011. 08. 08]http://www.agc.org/.

[16]

Kermanshachi.US multi-party standard partnering contract for integrated project delivery[J].Journal of Masters Abstracts International.2010, 48(6):174-185. 

[17]

U. S. General Service Administration(GSA). 3D-4D Building Information Modeling[OL]. (2011. 03)[2011. 05. 08]http://www.gsa.gov/portal/category/21062.

[18]

National Institute of Building Science. National Building Information Modeling Standard[OL]. [2011. 09. 03]http://www.wbdg.org/bim/nbims.php.

[19]

Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston. BIM Handbook[OL]. [2011. 09. 03] http://books.google.com/books?id=IioygN0nYzMC&hl=zh-CN.

[20]

Fish, Amanda. Integrated project delivery the obstacles of implementation[OL]. (2011. 05)[2011. 08. 08]http://krex.k-state.edu/dspace/handle/2097/8554.

[21]

The American Institute of Architects(AIA). 2008AIA Documents Advance the Use of BIM and IPD[OL]. (2008. 06)[2011. 05. 08]http://www.aia.org/index.htm.

[22]

The Associated General Contractors of America(AGC). Contracts Catalog[OL]. (2011. 07)[2011. 09. 03]http://www.agc.org/.

[23]

Nadine M.Leonidas.Integrated-Project-Delivery Boosters Ignore Many Flashing Red Lights[J].Journal of Engineering News-Record(ENR).2010, 264(14):22-24. 

[24]

Reza Ghassemi.Transitioning to Integrated Project Delivery-Potential barriers and lessons learned[J].Journal of Lean Construction Journal.2011, (1):32-52. 

[25]

Islam.H.El-adaway.Integrated Project Delivery Case Study Guidelines for Drafting Partnering Contract[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction.2010, 2(4):248-254.doi: 10.1061/(ASCE)LA.1943-4170.0000024

[26]

Stephen A.Hilger.The Legal Worries Raised by IPD[J].Journal of Engineering News-Record(ENR).2010, 264(30):12-19. 

[27]

Pardis B. Pishdad. Integrating Multi-Party Contracting Risk Management(MPCRM) Model with Building Information Modeling(BIM)[OL]. (2010. 08)[2011. 08. 08]http://itc.scix.net/data/works/att/w78-2010-44.pdf.

[28]

Leentje Volker.architect participation in integrated project delivery-the future mainspring of architectural design firms[J].Journal of Gest?o & Tecnologia de Projetos.2010, 5(3):22-37. 

[29]

W. Nofera, S. Korkmaz., V. Miller. Innovative Features of Integrated Project Delivery Shaping Project Team Communication. Proceedings of Engineering Project Organizations Conference, Estes Park[C]. USA 2010.

[30]

The American Institute of Architects(AIA). Crossing the IPD Chasm with BIM[OL]. (2010. 10)[2011. 05. 08]http://www.aia.org/index.htm.

[31]

Franklin D. Lancaster. Integrated Project Delivery-Next-Generation BIM for Structural Engineering. Proceedings of 2010 Structures Congress?2010 ASCE, Washington, DC[C]. USA 2010.

[32]

The Department of Treasury and Finance. The Practitioners' Guide to Alliance Contracting[OL]. (2010. 10. 25)[2011. 05. 08] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing.

[33]

Ryan E.Smith.Lean and Integrated Project Delivery[J].Journal of Lean Construction.2011, (1):1-16. 

[34]

Howard Mckew.INTEGRATED-Project Delivery.[J] Journal of Engineered Systems.2009, 26(1):108-118.

[35]

Guangbin Wang. Cooperation between Building Information Modeling and Integrated Project Delivery Method Leads to Paradigm Shift of AEC Industry. Proceedings of the 2009 International Conference on Management and Service Science(MASS)[C]. USA 2009.

Metrics
  • PDF Downloads(15)
  • Abstract views(1588)
  • HTML views(1249)
Catalog

Figures And Tables

IPD and the Adoption of BIM in it

Ma Zhiliang, Ma Jiankun

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn