Citation: Li Xinglong, Dong Litao, Zang Yibin, Yang Gangyuan, Li Zhenyuan, Wu Xingpan. BIM Fast Optimization Statistical Reinforcement Technology in the Second Avenue Project of Runcheng. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(5): 82-87. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.15
2015, 7(5): 82-87. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.15
BIM Fast Optimization Statistical Reinforcement Technology in the Second Avenue Project of Runcheng
1. | CABR Technology Co., Ltd., Beijing 100013, China |
2. | Yunnan Construction Engineering General Contracting Company, Kuming 650011, China |
With a case study of the application of the steel bar in the second highway project of Runcheng, this paper explores the reinforced lofting, processing and optimization during green construction. With the social and economical development as well as advancement of science and technology, cities in China are continuously expanding. There come the problems of a large population, too many high-rise buildings and an increasing demand for building materials, especially rebar. The government initiates the green construction concept, which calls for energy saving, land saving, material saving and water saving. Material saving is the priority, and rebar is the main building material, which becomes the main factor for construction cost. Therefore, both parties attach great importance to the accurate calculation of rebar, and professional rebar processing and delivery is essential for material saving during green construction.
[1] |
张建平, 范喆, 王阳利, 等.基于4D-BIM的施工资源动态管理与成本实时监控[J].施工技术.2011(04):37-40.doi: 10.3969/j.issn.1001-2206.2011.04.011 |
[2] | |
[3] |
特来福. 威廉姆斯. 现代信息技术在工程建设项目管理中的应用[M]. 中国建筑工业出版社. [美], 2009. |
[4] |
何关培.BIM总论[M].北京:中国建筑工业出版社, 2011:(9). |
[5] |
候景新, 张洪磊.PKPM系列软件在BIM技术中的新应用[J].土木建筑工程信息技术, 2011, 3(2):20-24. |
Metrics
- PDF Downloads(12)
- Abstract views(1936)
- HTML views(607)