Citation: Chen Qiang, Deng Zhuobin, He Bo, Zhang Jiali. Key Technology & Software Implementation Method of BIM Based MEP Emergency Management System. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(2): 15-19.
2014, 6(2): 15-19.
Key Technology & Software Implementation Method of BIM Based MEP Emergency Management System
1. | South China Architectural Design & Research Institute, Guangzhou 510640, China |
2. | Guangzhou uBIM Consulting Ltd., Guangzhou 510630, China |
MEP emergency management is an important part of property management in the large commercial and public buildings. BIM technology can effectively assist to maintain, especially reduce the difficulty that repair workers understand the complex MEP system. At the same time, it can avoid checking a lots of drawings and related documents, improving the accuracy and efficiency of the daily maintenance and emergency repair. This paper focuses on the research of key technology and software implementation method which based on BIM model in the emergency management of MEP.
[1] |
广州优比建筑咨询有限公司. 《优比BIM建设项目设备管线应急维护管理系统》, 软件著作权申请资料, 2011 |
[2] |
葛清等.《BIM第一维度——项目不同阶段的BIM应用》, 中国建筑工业出版社, 2013 |
[3] |
Autodesk Navisworks 2013. NET API Reference Guide |
[4] |
秦洪现, 崔惠岚, 孙剑等.《Autodesk系统产品开发培训教程》, 化工工业出版社, 2008 |
[5] |
陈威兵, 张刚林, 黄飞江. 《基于手机的二维条码识读系统研究与开发》, 现代电子技术期刊论文2012 |
[6] |
Reto Meier. 《Professional Android 2 Application Development》, 2010 |
[7] |
Jesse Storimer. 《Working with TCP Sockets》, 图灵程序设计丛书, 2013 |
[8] |
Wallace B. McClure, Nathan Blevins. 《Professional Android Programming with Mono for Android and. NET/C#》, 移动与嵌入式开发技术, 2013 |
Metrics
- PDF Downloads(21)
- Abstract views(1418)
- HTML views(932)