• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Hao Xuechao, Cao Le, Fang Ligang, Huang Xiaobin, Wang Yuhao, Qi Nannan. BIM Technology Applied in Gui'an Comprehensive Bonded Zoneto Guide Large Formwork. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(5): 35-38. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.06

2015, 7(5): 35-38. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.06

BIM Technology Applied in Gui'an Comprehensive Bonded Zoneto Guide Large Formwork

1. 

CABR Technology Co., Ltd., Beijing 100013, China

2. 

CCCC First Highway Engineering Co., Ltd., Beijing Constrction Company, Beijing 100018, China

Web Publishing Date: 2015-10-01

[1]

顾琰.扣件式钢管脚手架高支模系统的设计与施工[J].建筑施工, 2008, 07:562-564.doi: 10.3969/j.issn.1004-1001.2008.07.018

[2]

张建平. BIM技术研究与应用[J].施工技术, 2011 (1) : 15-18. 

[3]

戚积岩.高支模施工在某建筑中的应用.黑龙江科技信息.2011, 25:283-283. 

[4]

何关培. BIM技术应用丛书[M]. 建筑工业. 2011.

[5]

黄锰钢, 王鹏翊. BIM在施工总承包项目管理中的应用价值探索[J].土木建筑工程信息技术, 2013, 5 (5): 88-91. 

Metrics
  • PDF Downloads(13)
  • Abstract views(1604)
  • HTML views(684)
Catalog

Figures And Tables

BIM Technology Applied in Gui'an Comprehensive Bonded Zoneto Guide Large Formwork

Hao Xuechao, Cao Le, Fang Ligang, Huang Xiaobin, Wang Yuhao, Qi Nannan

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com