• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Liu Jun, Meng Fangui, Wei Mengfan, Zhang Ke, Dong Jianfeng. Implementation Management of BIM in National Conventionand Exhibition Centre (Tianjin) Project. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(6): 58-63.

2014, 6(6): 58-63.

Implementation Management of BIM in National Conventionand Exhibition Centre (Tianjin) Project

1. 

TIANJIN TIANFANG CONSTRUCTION ENGINEERING CO., LTD., Tianjin 300350, China

2. 

NCEC (Tianjin) CO., LTD., Tianjin 300350, China

3. 

CABR Technology CO., LTD., Beijing 100013, China

Web Publishing Date: 2014-12-01

[1]

曹乐, 肖靖等.BIM技术在长江传媒大厦项目中阶段性应用(一) [J].土木建筑工程信息技术, 2014, 6(2):80-83. 

[2]

建研科技股份有限公司.BIM在科研实验楼设计与施工中的应用[J].建筑, 2013(11):49-53. 

[3]

K.Pramod Reddy. BIM for Building Owners and Developers: Making a Business Case for Using BIM on Projects [M]. hoboken new jersey: John Wiley & Sons, 2012【BIM大厦业主商业案例项目】.

[4]

孙峻, 李明龙等.业主驱动的BIM实施模式研究.土木工程与管理学报[J], 2013, 30(3):80-85. 

[5]

Computer Integrated Construction Research Program. (2013). "BIM Planning Guide for Facility Owners". Version 2. 0, June, The Pennsylvania State University, University Park, PA, USA. 【设施业主BIM应用导则】.

Metrics
  • PDF Downloads(21)
  • Abstract views(1177)
  • HTML views(672)
Catalog

Figures And Tables

Implementation Management of BIM in National Conventionand Exhibition Centre (Tianjin) Project

Liu Jun, Meng Fangui, Wei Mengfan, Zhang Ke, Dong Jianfeng

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn