Citation: Li Yang, Xiong Zhang, Jinshen Yu, Bohong Yuan, Kuo Yu, Liu Yang, Guoquan Ren. Application of BIM Technology in Prefabricated Building Projects. Journal of Information Technologyin Civil Engineering and Architecture, 2023, 15(5): 112-117. doi: 10.16670/j.cnki.cn11-5823/tu.2023.05.20
2023, 15(5): 112-117. doi: 10.16670/j.cnki.cn11-5823/tu.2023.05.20
Application of BIM Technology in Prefabricated Building Projects
1. | CCCC First Highway Engineering Group Co., Ltd., Xi'an 710000, China |
2. | China NorthwestArchitecture Design And Research Institute Co., Ltd., Xi'an 710000, China |
In recent years, with the guidance of national policies and industry trends, there are increasing prefabricated projects. Combining the BIM technology with project management, this paper puts forward the use of BIM technology to solve fabricated generally encountered in the process of project construction tower crane selection, precasting yard, prefabricated management solutions and prefabricated construction quality problems, which expects to provide certain reference for future engineering practice and promote the further development of BIM technology.
[1] |
靳惠文, 周冀伟, 易希鹏, 等. BIM技术助推装配式住宅施工精细化管理[J/OL]. 土木建筑工程信息技术: 1-9[2022-11-22]. |
[2] |
BIM技术助推装配式住宅施工精细化管理[J]. 靳惠文[C]//第十届"龙图杯"全国BIM大赛获奖工程应用文集, 2021: 77-79. |
[3] | |
[4] |
严心军, 曹少卫, 张涛, 等. DMBP装配式机房设备管线施工技术[J]. 土木建筑工程信息技术, 2021, 13(1): 63-69.doi: 10.16670/j.cnki.cn11-5823/tu.2021.01.10 |
[5] | |
[6] |
中国二十冶集团有限公司. 装配式建筑塔吊型号和位置确定的方法: CN201811010795.9[P]. 2019-01-18. |
[7] |
中国二十冶集团有限公司. 一种装配式建筑预制构件堆场位置的确定方法: CN201911244147.4[P]. 2020-05-19. |
[8] |
刘濠, 洪洁茹, 章梦霞, 等. 结合BIM与二维码技术的装配式建筑信息管理方法研究[J]. 施工技术, 2020, 49(02): 110-114+118. |
[9] | |
[10] |
刘春城. BIM技术在学校建设工程装配式部分的模拟应用[D]. 沈阳建筑大学, 2019. |
[11] |
陆总兵. 基于BIM的装配式施工精细化管理研究[C]//第十二届中国管理科学大会优秀论文集, 2019: 34. |
[12] |
石华, 黄俊. 浅谈BIM技术在装配式建筑结构施工中的应用[J]. 中国建筑金属结构, 2021(09): 136-137. |
Metrics
- PDF Downloads(36)
- Abstract views(891)
- HTML views(686)