Citation: Li Zhi, Wang Jing. Risks and Coping Strategies of BIM Application in Construction Stage. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(2): 6-15. doi: 10.16670/j.cnki.cn11-5823/tu.2016.02.02
2016, 8(2): 6-15. doi: 10.16670/j.cnki.cn11-5823/tu.2016.02.02
Risks and Coping Strategies of BIM Application in Construction Stage
CABR Technology Co., Ltd., Beijing 100013, China |
This article introduces the trend of BIM technology and common points of application, reveals the seven neglected major risks behind the booming of BIM. Combining with practical engineering experience, it proposes solutions to deal with risks, which provides a reference for the BIM application in the construction stage.
[1] |
住房和城乡建设部.2011一2015年建筑业信息化发展纲要[J].建筑设计管理, 2011, 28(06):75-78.doi: 10.3969/j.issn.1673-1093.2011.06.019 |
[2] | |
[3] |
Peter Smith, BIM & the 5D Project Cost Manager, Procedia-Social and Behavioral Sciences, Volume l19, 19 March 2014, Pages 475-484. |
[4] |
Eadie R, Browne M, Odeyinka H, et al.BIM implementation throughout the UK construction project lifecycle:An analysis[J].Automation in Constmction, 2013, 36(12):145-151. |
[5] | |
[6] | |
[7] |
张春影, 高平, 汪茵等.施工图设计阶段BIM模型的工程算量问题研究[J].建筑经济, 2015, 36(8):52-56. |
[8] |
姜韶华, 李倩.基于BIM的建设项目文档管理系统设计[J].工程管理学报, 2012, 26(01):59-63.doi: 10.3969/j.issn.1674-8859.2012.01.012 |
Metrics
- PDF Downloads(34)
- Abstract views(2548)
- HTML views(1147)