Modified Heterogeneous Earliest Finish Time Algorithm for the Optimization of Construction Sublet and Schedule

1. 

Shanghai Jiading Transportation Development Group Co., Ltd., Shanghai 201899, China

2. 

College of Information Science and Engineering, Department of Computer Science and Engineering, East China University of Science and Technology, Shanghai 200237, China

Web Publishing Date: 2014-08-01

[1]

《建筑工程信息模型应用统一标准》编制组. 工程建设国家标准《建筑工程信息模型应用统一标准》征求意见稿[EB/OL]. http://news.zhulong.com/read183517.htm.2013.

[2]

中华人民共和国中央人民政府住房城乡建设部. 2011-2015年建筑业信息化发展纲要[EB/OL]. http://www.gov.cn/gongbao/content/2011/content_2010588.htm.2011.

[3]

M. R. Gary and D. S. Johnson. Computers and Intractability: A Guide to the Theory of NP-Completeness[M]. San Francisco: W. H. Freeman and Co., 1979.

[4]

Xu Yuming, Li Kenli, He Ligang.A DAG scheduling scheme on heterogeneous computing systems using double molecular structure-based chemical reaction optimization[J].Journal of parallel and distributed computing, 2013, 73(9):1306-1322.doi: 10.1016/j.jpdc.2013.05.005

[5]

Kim HJ, Anderson K, Lee SH and Hildreth J.Generating construction schedules through automatic data extraction using open BIM(building information modeling) technology[J].Automation in Construction, 2013, 35:285-295.doi: 10.1016/j.autcon.2013.05.020

[6]

Chen YH and Wang GB. Integration of Construction Investment and Progress Control Based on BIM[A]. 2013 3th International Conference on Intelligent System Design And Engineering Applications(ISDEA)[C]. Washington, DC: IEEE Computer Society, 2013: 894-896.

[7]

论文集析出文献: 作者. 题名[A]. 编者. 论文集名[C]. 出版地: 出版者, 出版年. 起止页码.

[8]

Elbeltagi E and Dawood M.Integrated visualized time control system for repetitive construction projects[J].Automation in Construction, 2011, 20:940-953.doi: 10.1016/j.autcon.2011.03.012

[9]

Roh S, Aziz Z and Pena-Mora F.An object-based 3D walk-through model for interior construction progress monitoring[J].Automation in Construction, 2011, 20:66-75.doi: 10.1016/j.autcon.2010.07.003

[10]

Kim C, Son H and Kim C.Automated construction progress measurement using a 4D building information model and 3D data[J].Automation in Construction, 2013, 31:75-82.doi: 10.1016/j.autcon.2012.11.041

[11]

Turkan Y, Bosche F, Haas CT and Haas R.Toward Automated Earned Value Tracking Using 3D Imaging Tools[J].Journal of Construction Engineering And Management-ASCE, 2013, 139(4):423-433.doi: 10.1061/(ASCE)CO.1943-7862.0000629

[12]

Chen SM, Griffis FH, Chen PH and Chang LM.A framework for an automated and integrated project scheduling and management system[J].Automation in Construction, 2013, 35:89-110.doi: 10.1016/j.autcon.2013.04.002

[13]

Song S, Yang J and Kim N.Development of a BIM-based structural framework optimization and simulation system for building construction[J].Computers in Industry, 2012, 63(9):895-912.doi: 10.1016/j.compind.2012.08.013

[14]

Wang Wei-Chih, Weng Shao-Wei, Wang Shih-Hsu and Chen Cheng-Yi.Integrating building information models with construction process simulations for project scheduling support[J].Automation in Construction, 2014, 37:68-80.doi: 10.1016/j.autcon.2013.10.009

[15]

J.Hwang, Y.Chow, F.Anger, C.Lee.Scheduling precedence graphs in systems with interprocessor communication times[J].SIAM Journal on Computing, 1989, 18(2):244-257.doi: 10.1137/0218016

[16]

E.Hou, N.Ansari, H.Ren.A genetic algorithm for multiprocessor scheduling[J].IEEE Transactions on Parallel and Distributed Systems, 1994, 5(2):113-120.doi: 10.1109/71.265940

Metrics
  • PDF Downloads(8)
  • Abstract views(1215)
  • HTML views(639)
Catalog

Figures And Tables

Modified Heterogeneous Earliest Finish Time Algorithm for the Optimization of Construction Sublet and Schedule

Cai Ning, Zhang Huanhuan, Jiang Yuyi

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com