Citation: Shen Shiqi, Ruan Yunshu, Zhao Shixiao, Zhu Hongke, Xiong Fei. Application of PKPM-BIM in Prefabricated Construction Buildings in Binhurunyuan Residential Area (Ⅱ). Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(4): 57-61. doi: 10.16670/j.cnki.cn11-5823/tu.2017.04.11
2017, 9(4): 57-61. doi: 10.16670/j.cnki.cn11-5823/tu.2017.04.11
Application of PKPM-BIM in Prefabricated Construction Buildings in Binhurunyuan Residential Area (Ⅱ)
1. | China Academy of Building Research, Beijing Glory PKPM Techenology Co., Ltd., Beijing 100013, China |
2. | Beijing Fangjian Construction Co., Ltd., Beijing 102445, China |
3. | China Construction First Building(Group)Co., Ltd., Beijing 100073, China |
BIM technology enables the virtual simulation for each stage through the digital modeling during the life cycle of project, and such character is also a prerequisite for the implementation of PC project. Currently, how to provide an information-integrated delivery at the design stage is a big challenge for the PC industry. Another challenge for prefabricated construction project is to achieve the industrialized and automatically production from taking the design delivery to implementing the production management. This paper follows the paper, Application of BIM Technology in Binhurunyuan Prefabricated Project (Ⅰ), and continues to discuss how to apply the BIM data in the production management system, and to present how to produce prefabricated component in an industrialized way via the production management system.
[1] |
沈诗琪, 阮运书, 赵士笑, 等.BIM技术在滨湖润园装配式住宅中的应用(上)[J].土木建筑工程信息技术, 2017, 9(3):47-51. |
[2] | |
[3] | |
[4] |
刘占省, 马锦姝, 徐瑞龙, 等.基于建筑信息模型的预制装配式住宅信息管理平台研发与应用[J].建筑结构学报, 2014, 35:59-66. |
Metrics
- PDF Downloads(31)
- Abstract views(2617)
- HTML views(1141)