Citation: Zhang Jihui, Wang Guangbin. Suggestions on Research of BIM Technology Based on OKR Model. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(4): 20-27. doi: 10.16670/j.cnki.cn11-5823/tu.2019.04.04
2019, 11(4): 20-27. doi: 10.16670/j.cnki.cn11-5823/tu.2019.04.04
Suggestions on Research of BIM Technology Based on OKR Model
1. | Shanghai Zhibi Architectural Technology Co., Ltd., Shanghai 200437, China |
2. | Tongji University, Shanghai 200082, China |
It has been already 10 years since BIM technology was used in the construction of venues for the Beijing Olympic Games.Although BIM technology has been vigorously promoted by the government and widely publicized by the industry, there were merely fewer than 5000 construction projects (about 6‰ of all projects) in 2018 adopted the BIM technology.Following the concept of business process reengineering, this paper reviews the development of BIM technology in construction industry by using OKR model and combing BIM technology from the source.At last, according to the review results, the direction and suggestions for further research on BIM technology are put forward for the future consideration and research.
[1] |
卢琬玫.BIM技术及其在建筑设计中的应用研究[D].天津大学, 2014. |
[2] |
何关培."BIM"究竟是什么?[J].土木建筑工程信息技术, 2010, 2(3): 111-117.doi: 10.3969/j.issn.1674-7461.2010.03.019 |
[3] |
张翔.结合BIM技术的绿色建筑评价研究[D].安徽建筑大学, 2018. |
[4] |
宋悦, 解皓.BIM技术在建筑生命周期管理(BLM)中对环境效益的影响[J].中外建筑, 2017(08): 191-193. |
[5] |
Hammer, M.1990.Reengineering work: Don't automate, obliterate.Harvard Business Review(July-August): 104-112. |
[6] | |
[7] |
周新会.基于流程驱动的项目管理信息系统[J].土木建筑工程信息技术, 2011, 3(1): 63-66.doi: 10.3969/j.issn.1674-7461.2011.01.012 |
[8] |
宋振乾.项目绩效管理系统的设计思路和实践[J].软件, 2017, 38(12): 180-184.doi: 10.3969/j.issn.1003-6970.2017.12.034 |
[9] |
隽振宁.MIS系统开发有关项目管理的几点建议[J].计算机光盘软件与应用, 2014, 17(18): 156-157. |
[10] |
M Buckingham, A Goodall.Reinventing performance management[J]. Harvard Business Review, 2015, 93(4): 40-50. |
[11] |
Andreas Wibowo, Hans Wilhelm Alfen.Government-led critical success factors in PPP infrastructure development[J]. Built environment project and asset management, 2015(1): 121-134. |
[12] |
魏永辉.铭园饭店绩效管理信息系统构建研究[D].燕山大学, 2017. |
Metrics
- PDF Downloads(49)
- Abstract views(2295)
- HTML views(1424)