[1] |
蒋慧, 李希胜.基于BIM的建筑结构协同设计关键问题研究[J].森林工程, 2018, 34(6): 102-108.
|
[2] |
王军, 李希胜, 刘勤文.基于Dynamo的绿色建筑方案设计优化[J].土木建筑工程信息技术, 2019, 11(3): 121-127.
|
[3] |
刘勤文, 李希胜, 王军.以装配率为导向的装配式建筑方案设计优化[J].土木建筑工程信息技术, 2019, 11(2): 122-128.
|
[4] |
王飞鹏, 吴涛, 刘喜, 等.基于BIM技术的装配式剪力墙结构研究[J].施工技术, 2019, 48(6): 21-24+88.
|
[5] |
靳鸣, 方长建, 李春蝶. BIM技术在装配式建筑深化设计中的应用研究[J].施工技术, 2017, 46(16): 53-57.
|
[6] |
冯青, 陆小龙, 汪德江, 等.基于BIM的装配整体式混凝土梁的拆分研究[J].土木建筑工程信息技术, 2016, 8(5): 83-85.
|
[7] |
刘春原, 许晓文, 付素娟.部分装配式框架结构自动拆分办法[J].河北工业大学学报, 2018, 47(1): 103-109.
|
[8] |
Khalili A, Chua D K H.IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabrication[J]. Journal of Computing in Civil Engineering, 2012, 27(3): 243-253.
|
[9] |
Wang Z, Hao H. Dynamic response to demand variability for precast production rescheduling with multiple lines[J]. International Journal of Production Research, 2018, 1-16.
|
[10] |
Ko C H, Wang S F. GA-based decision support systems for precast production planning[J]. Automation in Construction, 2010, 19(7): 907-916.
|
[11] |
Ko C H, Wang S F. Precast production scheduling using multi-objective genetic algori-thms[J]. Expert Systems with Applications, 2011, 38(7): 8293-8302.
|
[12] |
Li S H A, Tserng H P, yin S Y L, et al. A production modeling with genetic algorithms for a stationary pre-cast supply chain[J]. Expert Systems with Applications, 2010, 37(12): 8406-8416.
|
[13] |
Chen J H, Yang L R, Tai H W. Process reengineering and improvement for building precast production[J]. Automation in Construction, 2016, 68: 249-258.
|
[14] |
Wang Z, Hu H, Gong J.Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components[J]. Automation in Construction, 2018, 86: 69-80.
|
[15] |
徐照, 占鑫奎, 张星. BIM技术在装配式建筑预制构件生产阶段的应用[J].图学学报, 2018, 39(6): 136-143.
|
[16] |
Bock T. Digital design and robotic production of 3D shaped precast components[C]//The 25th International Symposium on Automation and Robotics in Construction, Vilnius Lithuania. 2008, 11-21.
|
[17] |
李永敢.装配式建筑预制混凝土构件自动化生产线设计配置技术[J].施工技术, 2018, 47(4): 47-51.
|
[18] |
刘建波, 王佳佳, 张礼华, 等.基于现场总线的PC构件码垛养护控制系研究[J].制造业自动化, 2018, 40(9): 34-37.
|
[19] |
Kim M K, Cheng J C P, Sohn H, et al. A framework for dimensional and surface quality assessment of precast concrete elements using BIm and 3D laser scanning[J]. Automation in Construction, 2015, 49: 225-238.
|
[20] |
yin S Y L, Tserng H P, Wang J C, et al. Developing a precast production management system using RFID technology[J]. Automation in Construction, 2009, 18(5): 677-691.
|
[21] |
马智亮, 杨之恬.基于BIM技术的预制构件生产管理系统框架研究[C].全国BIM学术会议, 2015.
|
[22] |
董娜, 张宁, 赵雪媛, 等.基于BIM与RFID的工业化建筑构件进度管理研究[J].施工技术, 2018, 47(10): 5-10.
|
[23] |
Ergen E, Akinci B, Sacks R. Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS[J]. Automation in construction, 2007, 16(3): 354-367.
|
[24] |
Irizarry J, Karan E P, Jalaei F. Integrating BIm and GIS to improve the visual monitoring of construction supply chain management[J]. Automation in construction, 2013, 31: 241-254.
|
[25] |
Im K S, Han S H, Koo B, et al.Formulation of a pull production system for optimal inventory control of temporary rebar assembly plants[J]. Canadian Journal of Civil Engineering, 2009, 36(9): 1444-1458.
|
[26] |
Hong W K, Lee G, Lee S, et al. Algorithms for in-situ production layout of composite precast concrete members[J]. Automation in Construction, 2014, 41(5): 50-59.
|
[27] |
周雅莉, 胡珉, 喻钢.基于IFC标准的隧道工程信息传递研究[J].土木建筑工程信息技术, 2015, 7(6): 1-4.
|
[28] |
杨波.基于BIM的桥梁结构健康监测信息可视化研究[D].重庆交通大学, 2018.
|
[29] |
Motamedi A, Soltani M M, Setayeshgar S, et al. Extending IFC to incorporate information of RFID tags attached to building elements[J]. Advanced Engineering Informatics, 2016, 30(1): 39-53.
|