Citation: Wen Tao. Comprehensive Application of BIM Technology in Guangxi New Media Center. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(5): 70-76. doi: 10.16670/j.cnki.cn11-5823/tu.2020.05.12
2020, 12(5): 70-76. doi: 10.16670/j.cnki.cn11-5823/tu.2020.05.12
Comprehensive Application of BIM Technology in Guangxi New Media Center
Hualan Design (Group) Co., Ltd., Naning 530011, China |
The Guangxi New Media Center is a super high-rise building project integrating TV communication, translation, production, broadcasting, film & television cultural exchange, radio & television exhibition and program exchange, with a total building area of 113 811.69 m2. The external facade of the building adopts 3D curved surface design, retracting layer by layer from bottom to top, which is very complex in shape. Numerous pipelines are arranged crosswise and intricate. The node designs for the steel structure canopy project, the glass curtain wall project and the GRC curtain wall project are all complicated, with many difficulties in construction. All above put forward many problems for the implementation of the project. The BIM application of the project covers the whole life cycle, from the preliminary scheme planning of project, to construction drawing, then construction, and finally operation period, which includes 3D simulation and display of the scheme, collision inspection, pipeline synthesis, pre layout of GRC curtain wall and steel structure components, 3D technical disclosure, construction simulation and roaming, and etc. Other than ensuring the smooth progress of the project, the BIM application also saves the construction period and costs, and ensures project quality and safety, creating an excellent project.
Metrics
- PDF Downloads(40)
- Abstract views(2398)
- HTML views(1258)