Citation: Kun Chen, Yue Wang, Ke Ren, Yishan Lin, Yan Hong, Xu Zheng, Zhiwei Huang. A Research on Dynamic Cost Management of Electric Power Project Based on BIM. Journal of Information Technologyin Civil Engineering and Architecture, 2023, 15(6): 26-31. doi: 10.16670/j.cnki.cn11-5823/tu.2023.06.05

2023, 15(6): 26-31. doi: 10.16670/j.cnki.cn11-5823/tu.2023.06.05

A Research on Dynamic Cost Management of Electric Power Project Based on BIM

1. 

Fujian Great Power Science and Technology Co., Ltd., Fuzhou, 350000, China

2. 

College of Management and Economics, Tianjin University, Tianjin 300072, China

Corresponding author: 任可,

Web Publishing Date: 2023-12-20

Fund Project: 天津大学2020重点项目资助课题“海外重大基础设施运营维护供应链管理与风险控制” 72031008

[1]

SMITH P. BIM & the 5D Project Cost Manager[J]. Procedia - Social and Behavioral Sciences, 2014, 119: 475-84.

[2]

于亮, 张新. BIM技术在建筑工程全生命周期的应用[J]. 智能城市, 2018, 4(19): 25-6.

[3]

李炳尧. 基于BIM技术的天津港建设项目全生命周期管理系统研究[D]; 天津大学, 2016.

[4]

过俊, 陈宇, 赵斌. BIM在建筑全生命周期中的应用[J]. 建筑技艺, 2010, (Z1): 209-14.

[5]

陈雅静. 电力工程项目成本管理研究[J]. 低碳世界, 2020, 10(01): 192-3. [6] 张进. 电力建设项目成本的控制及管理方法浅析[J]. 经济师, 2011, (07): 170+2.

[6]

KIM J, LIM J, LIM H-C, et al. Improving Sustainable Project Success Strategies Focused on Cost and Schedule for Electrical Construction Project Management[J]. Sustainability, 2022, 14(5).

[7]

HANNA A S. Using the Earned Value Management System to Improve Electrical Project Control[J]. Journal of Construction Engineering and Management-Asce, 2012, 138(3): 449-57.doi: 10.1061/(ASCE)CO.1943-7862.0000426

[8]

张金月. 5D BIM探索: Vico Office应用指南[M]. 同济大学出版社, 2019.

[9]

张啸驰. BIM技术在建筑工程成本管控中的应用[D]; 华北理工大学, 2020.

[10]

秦华伟. BIM在HF项目成本动态管理应用研究[D]; 华中科技大学, 2019.

[11]

祝雪锋. 项目成本管理及挣值法成本监控研究[D]; 重庆大学, 2005.

[12]

赵敬忠. 基于智慧建造的工程项目施工成本精细化管理研究[D]; 兰州理工大学, 2019

Metrics
  • PDF Downloads(24)
  • Abstract views(896)
  • HTML views(792)
Catalog

Figures And Tables

A Research on Dynamic Cost Management of Electric Power Project Based on BIM

Kun Chen, Yue Wang, Ke Ren, Yishan Lin, Yan Hong, Xu Zheng, Zhiwei Huang

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn