Citation: Feng Weichuang, Li Hao. Full Life Cycle BIM Application in the Ex-Situ Technical Transformation Project of Fuling Branch of Chongqing Tobacco Industry Co., Ltd.. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(5): 15-22. doi: 10.16670/j.cnki.cn11-5823/tu.2017.05.03
2017, 9(5): 15-22. doi: 10.16670/j.cnki.cn11-5823/tu.2017.05.03
Full Life Cycle BIM Application in the Ex-Situ Technical Transformation Project of Fuling Branch of Chongqing Tobacco Industry Co., Ltd.
SIPPR Engineering Group Co., Ltd., Zhengzhou 450007, China |
The ex-situ technical transformation project of Fuling branch of Chongqing tobacco industry Co., Ltd.is located in Lidu Industrial Park, Fuling District, Chongqing.At the design phase, BIM and simulation analysis technology are applied to effectively verify and optimize the design scheme.Through the 3D integrated pipeline design, the rework and waste caused by pipeline collision are reduced significantly.At the construction stage, the BIM-based construction simulation and coordination effectively improve the communication and coordination efficiency and project management level.After the completion of the project, all workshops have installed and deployed an independently-developed visual 3D information system platform using the completion model.The platform realizes the transmission and sharing of construction data, and is gradually playing a more significant role in plant operations, which lays a good data base for the follow-up construction of a digital plant.
[1] |
刘安业, 王要武, 罗玉龙. 基于全寿命周期的城市基础设施管理信息化研究[J]. 2008, (4): 91-94. |
[2] |
罗琦, 李志阳, 陶海波.基于Revit的三维协同设计平台研究[J].土木建筑工程信息技术, 2016, 8(1):59-64. |
[3] |
王毅.建筑机电工程施工深化设计探讨[J].房地产导刊, 2013, (14):337-338.doi: 10.3969/j.issn.1009-4563.2013.14.334 |
[4] |
Metrics
- PDF Downloads(28)
- Abstract views(1986)
- HTML views(853)