• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Chen Jiajia, Zhu Yan. Application of BIM Technology in Tianjin Yongji Garden (Phase Ⅱ) Project. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(6): 96-100. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.18

2015, 7(6): 96-100. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.18

Application of BIM Technology in Tianjin Yongji Garden (Phase Ⅱ) Project

1. 

Jiangsu Nantong Liujian Construction Group CO., LTD., Nantong 226500, China

2. 

Architectural Engineering Institute of Nantong Vocational University, Nantong 226500, China

Web Publishing Date: 2015-12-01

[1]

芦洪斌. BIM在建筑工程管理中的应用[D]. 大连: 大连理工大学, 2014.

[2]

赵灵敏, 岳广飞.山东省文化中心项目BIM应用实践[J].土木建筑工程信息技术, 2011, 3(4):51-57. 

[3]

Chuck Eastman, Paul Teicholz, Rafael sacks, et al. BIM handbook: a guide to building information modeling for owners, managers, designers and contractors[M]. New York: John Wiley & Sons Inc, 2008.

[4]

赵越华, 王益涛.BIM5D在天津永利大厦项目中的应用[J].城市住宅, 2014, (8):42-46. 

[5]

赵雪锋, 姚爱军, 刘东明, 宋强.BIM技术在中国尊基础工程中的应用[J].施工技术, 2015, 44 (6):49-53. 

Metrics
  • PDF Downloads(14)
  • Abstract views(2345)
  • HTML views(869)
Catalog

Figures And Tables

Application of BIM Technology in Tianjin Yongji Garden (Phase Ⅱ) Project

Chen Jiajia, Zhu Yan

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn