Citation: Chen Jiajia, Zhu Yan. Application of BIM Technology in Tianjin Yongji Garden (Phase Ⅱ) Project. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(6): 96-100. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.18
2015, 7(6): 96-100. doi: 10.16670/j.cnki.cn11-5823/tu.2015.06.18
Application of BIM Technology in Tianjin Yongji Garden (Phase Ⅱ) Project
1. | Jiangsu Nantong Liujian Construction Group CO., LTD., Nantong 226500, China |
2. | Architectural Engineering Institute of Nantong Vocational University, Nantong 226500, China |
This paper introduces the background, modeling process, collision detection, three dimensional layout of construction site, BIM5D software of BIM application in Tianjin Yongji garden (phase Ⅱ) project. It analyzes the value and problems in the process of BIM application. At last, it proposes the author's prospect of BIM.
Metrics
- PDF Downloads(14)
- Abstract views(2345)
- HTML views(870)