Citation: Xiao Jing, Cao Le, Mo Dai, Fu Wuwen, Zhang Wen, Dong Litao, Hao Xuechao, Zhang Kai. BIM Opens the New Future of Civil Aviation Construction——BIM Application in BOAO Airport. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(5): 1-9. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.01
2016, 8(5): 1-9. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.01
BIM Opens the New Future of Civil Aviation Construction——BIM Application in BOAO Airport
1. | CABR Technology Co., Ltd., Beijing 100013, China |
2. | BOAO Airport Management Co., Ltd., BOAO 571434, China |
As the key supporting project of BOAO Forum for Asia 2016, BOAO Airport was built in 10 months. The construction speed was double of the domestic similar projects. Considering the short period and the high orientation, the project used BIM technology to obtain high quality and performance, applied data reference for the airport construction under BIM times.
[1] | |
[2] | |
[3] | |
[4] |
董立涛, 徐汉涛, 曹乐, 等. BIM技术在武汉绿地中心劲性柱施工中的应用[J].土木建筑工程信息技术, 2015, 4(7): 41-43. |
[5] | |
[6] |
何清华, 钱丽丽, 段运峰, 等. BIM在国内外应用的现状及障碍研究[J].工程管理学报, 2012, 1:12-16.doi: 10.3969/j.issn.1674-8859.2012.01.003 |
[7] |
隋振国, 马锦明, 陈东, 等. BIM技术在土木工程施工领域的应用进展[J].施工技术, 2013, S2:161-165. |
[8] |
姚守俨.施工企业BIM建模过程的思考[J].土木建筑工程信息技术, 2012, 3:100-101&105.doi: 10.3969/j.issn.1674-7461.2012.03.021 |
[9] |
邓雪原, 苏昶, 孙鹏, 等.上海现代建筑设计(集团)建筑协同设计平台研究与应用[J].土木建筑工程信息技术, 2010, 2(3): 96-103. |
Metrics
- PDF Downloads(22)
- Abstract views(2334)
- HTML views(833)