• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Ma Zhiliang, Yang Zhitian. Functional Requirements Analysis of BIM Intelligent Scheduling and Control System for Precast Production of Prefabricated Residential Buildings. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(1): 1-7.

2015, 7(1): 1-7.

Functional Requirements Analysis of BIM Intelligent Scheduling and Control System for Precast Production of Prefabricated Residential Buildings

Tsinghua University, Beijing 100084, China

Web Publishing Date: 2015-02-01

Fund Project: 国家高技术研究发展计划 2013AA041307国家高技术研究发展计划资助(2013AA041307)

[1]

中华人民共和国国家统计局. 房屋竣工面积和住宅房屋竣工面积(2013年) http://www.stats.gov.cn/,2011[EB/OL]. 中华人民共和国国家统计局网, 2014-9-22.

[2]

Benjaoran V, Dawood N. Intelligence approach to production planning system for bespoke precast concrete products[J]. Automation in Construction, 2006, 15(6): 737-745.doi: 10.1016/j.autcon.2005.09.007

[3]

Leu S S, Hwang S T. A GA-based model for maximizing precast plant production under resource constraints[J]. Engineering Optimization, 2001, 33(5): 619-642.doi: 10.1080/03052150108940936

[4]

Ko C H, Wang S F. GA-based decision support systems for precast production planning[J]. Automation in Construction, 2010, 19(7): 907-916.doi: 10.1016/j.autcon.2010.06.004

[5]

Benjaoran V, Dawood N, Hobbs B. Flowshop scheduling model for bespoke precast concrete production planning[J]. Construction Management and Economics, 2005, 23(1): 93-105.doi: 10.1080/0144619042000287732

[6]

Wang L C, Lin S K. A multi-agent based agile manufacturing planning and control system[J]. Computers & Industrial Engineering, 2009, 57(2): 620-640. 

[7]

Sacks R, Eastman C M, Lee G. Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry[J]. Journal of Construction Engineering and Management, 2004, 130(2): 206-215.doi: 10.1061/(ASCE)0733-9364(2004)130:2(206)

[8]

Lee G, Sacks R, Eastman C. Product data modeling using GTPPM—A case study[J]. Automation in Construction, 2007, 16(3): 392-407.doi: 10.1016/j.autcon.2006.05.004

[9]

Lee G, Eastman C M, Sacks R. Eliciting information for product modeling usin g process modeling[J]. Data & Knowledge Engineering, 2007, 62(2): 292-307. 

[10]

Sacks R, Eastman C M, Lee G. Information and process flow in models of precast concrete design and construction[C] Proceedings of 3rd International Conference on Concurrent Engineering in Construction. 2002.

[11]

Sacks R, Eastman C M, Lee G. Generating IFC views and conformance classes using GTPPM[C]. Proceedings of Information and Process Flow In models. 2002, 51-62.

[12]

姚小风.工厂生产计划制订与执行精细化管理手册[M].北京:民邮电出版社, 2014.

[13]

Nenadč Babič, Peter Podbreznik, Danijel Rebolj. Integrating resource production and construction using BIM[J]. Automation in Construction, 2010, 19(5):539-543.doi: 10.1016/j.autcon.2009.11.005

[14]

simulation[G/OL]. Wikipedia, 2013. Discrete event

[15]

Dawood N, Marasini R. Visualisation of a stockyard layout simulator "SimStock": a case study in precast concrete products industry[J]. Automation in Construction, 2003, 12(2): 113-122.doi: 10.1016/S0926-5805(02)00044-4

[16]

Marasini R, Dawood N. A simulation approach to optimize stockyard layout: A case study in precast concrete products industry[J]. Ed Gudnason, G., Construction Information Technology, 2000: 610-619. 

[17]

Radio-frequency identification[G/OL]. Wikipedia, 2013. http://en.wikipedia.org/wiki/Radio-frequency_identification.

[18]

Genetic algorithm[G/OL]. Wikipedia, 2013. http://en.wikipedia.org/wiki/Genetic_algorithm.

[19]

Multi-agent system[G/OL]. Wikipedia, 2014. http://en.wikipedia.org/wiki/Multi-agent_system.

Metrics
  • PDF Downloads(16)
  • Abstract views(1287)
  • HTML views(925)
Catalog

Figures And Tables

Functional Requirements Analysis of BIM Intelligent Scheduling and Control System for Precast Production of Prefabricated Residential Buildings

Ma Zhiliang, Yang Zhitian

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn