Citation: Liu Xuan, He Yi. Analysis and Suggestion on Precision of Construction-Level Model for Construction Engineering. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(3): 139-143. doi: 10.16670/j.cnki.cn11-5823/tu.2020.03.21
2020, 12(3): 139-143. doi: 10.16670/j.cnki.cn11-5823/tu.2020.03.21
Analysis and Suggestion on Precision of Construction-Level Model for Construction Engineering
The Third Construction Co., Ltd., of YCIH, Kunming 650000, China |
As to the construction-level BIM models, considering that the requirements of engineering project implementation and different disciplines on information of the BIM application are different, and that the existing model accuracy requirements for reference is, however, based on the design inertia under the premise of whole life cycle, many BIM models are not suitable for the construction stage of a project. Therefore, it is necessary to establish the accuracy standard of construction-level BIM models.
[1] |
GB/T51235-2017.建筑工程施工信息模型应用标准[S]. |
[2] |
DB11T 1069-2014.民用建筑信息模型设计标准[S].北京市城乡规划标准办公室, 2014. |
[3] |
CIS11001-2015.建筑机电工程BIM构件库技术标准[S].中国安装协会, 2015. |
[4] |
DG/TJ08-2201-2016.建筑信息模型应用标准[S].中华人民共和国住房和城乡建设部, 2016. |
[5] | |
[6] |
清华大学软件学院BIM课题组.中国建筑信息模型标准框架研究[J].土木建筑工程信息技术, 2010, 2(2): 1-5.doi: 10.3969/j.issn.1674-7461.2010.02.001 |
[7] |
姚守俨.施工企业BIM建模过程的思考[J].土木建筑工程信息技术, 2012, 4(3): 100-101, 105.doi: 10.3969/j.issn.1674-7461.2012.03.021 |
[8] |
雷丽英, 骆汉宾.建筑业信息化标准体系设计[J].土木建筑工程信息技术, 2010, 2(4): 9-13.doi: 10.3969/j.issn.1674-7461.2010.04.003 |
[9] | |
[10] |
壮真才.BIM技术在钢结构施工管理中的应用[J].建筑技术开发, 2016, 43(9): 81-82.doi: 10.3969/j.issn.1001-523X.2016.09.046 |
[11] |
李祥进, 许骏, 刘昭.基于BIM模型的施工项目信息管理[J].土木建筑工程信息技术, 2015, 7(6): 83-86. |
Metrics
- PDF Downloads(40)
- Abstract views(2389)
- HTML views(1540)