Citation: Xu Yanzhao, Li Yawei, Yang Jun. Technology and Quality Control of Shield Empty Across the Mining Method for Tunnel Construction. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(1): 53-58. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.09
2016, 8(1): 53-58. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.09
Technology and Quality Control of Shield Empty Across the Mining Method for Tunnel Construction
1. | China Railway Tunnel Group Co., Ltd., Luoyang 471009, China |
2. | School of Civil Engineering&Mechanics, Huazhong University of Science&Technology, Wuhan 430074, China |
Shield method construction. as a kind of safe and effective method of tunnel construction. plays a positive role in the construction of urban rail transit in our country. However, an interval, including partial hard rock section. iS difficult for shield tunneling machine to push forward. When the hard rock drivage reaches a certain length. we usually use "shield law" + "mines" composite construction method. Although this method can improve the construction speed and reduce the construction risk, but also causes many problems. According to the actual situation of Wuhan subway construction, this paper introduces the key technologies and quality control measures of shield to shield, shield advance and receiving phase with good results in the weathered mudstone formation of the hollow push mining method in tunnel construction, providing a useful reference for similar projects.
[1] |
侯学渊, 钱达仁, 杨林德. 软土工程施工新技术[M]. 安徽科学技术出版社, 1999. |
[2] |
陈玉新. 盾构在矿山法隧道推进技术[J]. 中国中铁隧道集团2007年水底隧道专题技术交流大会论文集, 2007. |
[3] | |
[4] |
高凯.盾构在矿山法隧道中空推管片纵向受力分析[J].山西建筑, 2012, 38(10):183-184.doi: 10.3969/j.issn.1009-6825.2012.10.108 |
[5] |
谢国兵.盾构空推过曲线暗挖隧道的管片质量控制[J].铁道建筑技术, 2014, 9:5.doi: 10.3969/j.issn.1009-4539.2014.04.002 |
Metrics
- PDF Downloads(15)
- Abstract views(2032)
- HTML views(941)