Citation: Zhang Kun, Liu Xiaojing, Gao Shichao, Liu Zhao. Application of BIM Construction Process in Zibo-Weifang Section of Jiqing High-Speed Railway. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(6): 74-79. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.12
2018, 10(6): 74-79. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.12
Application of BIM Construction Process in Zibo-Weifang Section of Jiqing High-Speed Railway
1. | Shandong Branch Office of China Railway Construction Engineering Group Co., Ltd., Qingdao 266000, China |
2. | Jiqing High-Speed Railway Co., Ltd., Jinan 250000, China |
3. | Jinan Design Institute, China Railway Engineering Design Consulting Group Co., Ltd., Jinan 250000, China |
The Jinan-Qinghai high-speed railway is an important part of the national planning of the "eight vertical and eight horizontal" passenger transport corridor, and is also the "backbone" of the "three horizontal and five vertical" high-speed railway network in Shandong Province. The station buildings of this project possess the characteristics of novel structure, heavy construction task and complicated pipeline construction. Through the BIM application, the project is aiming at improving all-round project management and control, and achieving fine management as well. This paper introduces the application of BIM technology Zibo North Railway Station and Weifang North Railway Station, specifically, in installation deepening design of pipeline, curtain wall and indoor decoration. The BIM platform of Jinan-Qinghai High-speed Railway is applied to realize multi-professional integration, safety and quality management, cost control, change management, and etc. Latest VR technology, 3D scanning technology, intelligent site system and other supporting projects is also introduced assisting projects to complete the construction task with high quality and efficiency. Through the application of BIM technology, the project comprehensively improves the project management level, precisely controls the project cost, simplifies the project management process, realizes the comprehensive management and control of the whole life cycle of the project, and provides a reference implementation scheme for the application of BIM technology in the subsequent construction of railway station building projects.