Citation: Hu Yi, Kang Zhihong, Cao Le, Wang Que, Zhang Kai, Hao Xuechao, Wang Hao, Yan Wen. Comprehensive Application of BIM Technology in Beijing Zhongguancun Technology Park-Fengtai Innovation Center. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(4): 7-12. doi: 10.16670/j.cnki.cn11-5823/tu.2019.04.02
2019, 11(4): 7-12. doi: 10.16670/j.cnki.cn11-5823/tu.2019.04.02
Comprehensive Application of BIM Technology in Beijing Zhongguancun Technology Park-Fengtai Innovation Center
1. | China Fortune Foundation Co., Ltd., Beijing 100071, China |
2. | China Academy of Building Research, Beijing 100013, China |
Beijing Zhongguancun Technology Park-Fengtai Innovation Center Project is a high-rise building integrating government office and international business, with a total construction area of 580000 square meters.It has the huge engineering volume, the long construction period and the complex scale of electromechanical pipelines.The complicated construction of curtain wall and landscape is also the feature and difficulty of this project.BIM technology for this project covers the entire life cycle of the building from pre-design, construction to post-operation stage.The main application points of BIM technology are including collaborative management platform, 3D drawing review, electromechanical integrated, construction simulation and the VR application for the key area of hardbound model to insure the successful implementation of the project.In addition, these applications can shorten the construction period, reduce costs, and create a quality building.
[1] | |
[2] |
李云贵, 何关培, 邱奎宁.建筑工程施工BIM应用指南[M].中国建筑工业出版社, 2017. |
[3] |
张建平, 余芳强, 李丁.面向建筑全生命期的集成BIM建模技术研究[J].土木建筑工程信息技术, 2012, 4(1): 6-14.doi: 10.3969/j.issn.1674-7461.2012.01.002 |
[4] | |
[5] | |
[6] |
邱贵聪, 杨洁, 陈一鸣.BIM+VR、AR应用研究[J].土木建筑工程信息技术, 2018, 10(3): 22-27. |
[7] |
刘旭红, 武飞.基于BIM的虚拟现实技术(VR)在建筑工程中的创新应用[J].中外建筑, 2018(4): 134-136. |
[8] |
何关培.《中国工程建设BIM应用研究报告2011》解析[J].土木建筑工程信息技术, 2012, 4(1): 15-21.doi: 10.3969/j.issn.1674-7461.2012.01.003 |
[9] |
郑华海, 刘匀, 李元齐.BIM技术研究与应用现状[J].结构工程师, 2015(4): 233-241.doi: 10.3969/j.issn.1005-0159.2015.04.033 |
Metrics
- PDF Downloads(66)
- Abstract views(2525)
- HTML views(1118)