Citation: Lu Youyue, He Zhiming, Qin Wenbo, Qin Yawei. Study on BIM-based Project Controlling Platform of Wuhan Yangsigang Yangtze River Bridge. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(6): 16-21. doi: 10.16670/j.cnki.cn11-5823/tu.2017.06.03
2017, 9(6): 16-21. doi: 10.16670/j.cnki.cn11-5823/tu.2017.06.03
Study on BIM-based Project Controlling Platform of Wuhan Yangsigang Yangtze River Bridge
1. | Wuhan Tian-xing-zhou Bridge Investment Development Co., Ltd., Wuhan 430074, China |
2. | School of Civil Engineering and Mechanics, Huazhong University of Scienceand Technology, Wuhan 430074, China |
This paper firstly elaborates the difficulties of super-large bridge project management, as well as the status of the application of project controlling in the field of traffic engineering. Through the analysis of defects of project controlling mode in information collection, processing and analysis, as well as analysis of advantages of BIM technology application in the project controlling, a BIM-based project controlling mode is proposed, and a BIM-based project controlling platform is established. The overall structure of the platform consists of eight major functional modules, to achieve the implementation of BIM-based project controlling mode. At last, applications of the platform in the Wuhan Yangsigang Yangtze River Bridge project have achieved good results, which provides useful references for the BIM technology applications in the project controlling mode.
[1] | |
[2] | |
[3] | |
[4] | |
[5] |
骆汉宾, 工程项目管理信息化. 2011: 中国建筑工业出版社. |
[6] |
何清华, 钱丽丽, 段运峰, 等.BIM在国内外应用的现状及障碍研究[J].工程管理学报, 2012, 26(1): 12-16. |
[7] |
Ding L, Zhou Y, Akinci B.Building InformationModeling(BIM)application framework:The process of expanding from 3D to computable nD[J].Automation in Construction, 2014, 46: 82-93.doi: 10.1016/j.autcon.2014.04.009 |
[8] | |
[9] |
Sacks R, Barak R, Belaciano B, et al.KanBIM Workflow Management System:Prototype implementation and field testing.[J].Lean Construction Journal, 2013. |
[10] |
骆汉宾, 姚军.轨道交通工程项目总控组织设计研究[J].武汉理工大学学报(信息与管理工程版), 2007, 29(1): 104-107. |
Metrics
- PDF Downloads(31)
- Abstract views(2761)
- HTML views(954)