• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Yang DeLei. Summarize on Current Situation of Foreign BIM Implementation. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(6): 89-94, 100.

2013, 5(6): 89-94, 100.

Summarize on Current Situation of Foreign BIM Implementation

SouFun Holdings Limited, Tianjin 300051, China

Web Publishing Date: 2013-12-01

[1]

LAISERIN J. Comparing pommes and naranjas [EB/OL]. (2002)http://www.Laiserin.com/.

[2]

GUO H L., LI H., SKITMORE M. Life cycle management of construction projects based on Virtual Prototyping technology[J]. Journal of Management in Engineering, 2010, 26(1): 41-47.doi: 10.1061/(ASCE)0742-597X(2010)26:1(41)

[3]

Wong A K D., Wong F K W, Nadeem A. Comparative roles of major stakeholders for the implementation of BIM in various countries[C]. Proceedings of the International Conference on Changing Roles: New Roles, New Challenges, Noordwijk Aan Zee, The Netherlands, 5-9 October. Development Bureau, Government of the Hong Kong Special Administrative Region, 2009.

[4]

Dossick C S., Neff G.Organizational divisions in BIM-enabled commercial construction[J].Journal of construction engineering and management, 2009, 136(4):459-467. 

[5]

Linderoth H C J.Understanding adoption and use of BIM as the creation of actor networks[J].Automation in construction, 2010, 19(1):66-72.doi: 10.1016/j.autcon.2009.09.003

[6]

Singh, V., N.Gu and X.Wang, A theoretical framework of a BIM-based multi-disciplinary collaboration platform.Automation in Construction, 2011.20(2):p.134-144.doi: 10.1016/j.autcon.2010.09.011

[7]

Sanguinetti, P., et al., General system architecture for BIM:An integrated approach for design and analysis.Advanced Engineering Informatics, 2012.26(2):p.317-333.doi: 10.1016/j.aei.2011.12.001

[8]

Jung, Y.and M.Joo, Building information modelling(BIM)framework for practical implementation.Automation in Construction, 2011.20(2):p.126-133.doi: 10.1016/j.autcon.2010.09.010

[9]

Yan W., Culp C., Graf R.Integrating BIM and gaming for real-time interactive architectural visualization[J].Automation in Construction, 2011, 20(4):446-458.doi: 10.1016/j.autcon.2010.11.013

[10]

Redmond A., Hore A., Alshawi M., et al.Exploring how information exchanges can be enhanced through Cloud BIM[J].Automation in Construction, 2012, 24:175-183.doi: 10.1016/j.autcon.2012.02.003

[11]

Barlish K, Sullivan K.How to measure the benefits of BIM—A case study approach[J].Automation in construction, 2012, 24:149-159.doi: 10.1016/j.autcon.2012.02.008

[12]

Lee, G., H.K.Park and J.Won, D3 City project — Economic impact of BIM-assisted design validation.Automation in Construction, 2012.22(0):p.577-586. 

[13]

Bryde, D., M.Broquetas and J.M.Volm, The project benefits of Building Information Modelling(BIM).International Journal of Project Management, 2013.31(7):p.971-980. 

[14]

Davies R., Harty C.Implementing 'Site BIM':A case study of ICT innovation on a large hospital project[J].Automation in Construction, 2013, 30:15-24.doi: 10.1016/j.autcon.2012.11.024

[15]

Isikdag U.Design patterns for BIM-based service-oriented architectures[J].Automation in Construction, 2012, 25:59-71.doi: 10.1016/j.autcon.2012.04.013

[16]

Gu N., London K.Understanding and facilitating BIM adoption in the AEC industry[J].Automation in construction, 2010, 19(8):988-999.doi: 10.1016/j.autcon.2010.09.002

[17]

Arayici Y., Coates P, Koskela L, et al.Technology adoption in the BIM implementation for lean architectural practice[J].Automation in Construction, 2011, 20(2):189-195.doi: 10.1016/j.autcon.2010.09.016

[18]

Irizarry, J., E.P.Karan and F.Jalaei, Integrating BIM and GIS to improve the visual monitoring of construction supply chain management.Automation in Construction, 2013.31(0):p.241-254. 

[19]

Kim, H., et al., Generating construction schedules through automatic data extraction using open BIM(building information modeling)technology.Automation in Construction, 2013(0). 

[20]

Motawa I., Almarshad A.A knowledge-based BIM system for building maintenance[J].Automation in Construction, 2013, 29:173-182.doi: 10.1016/j.autcon.2012.09.008

[21]

Zhang S., Teizer J., Lee J K., et al.Building information modeling(BIM)and safety:Automatic safety checking of construction models and schedules[J].Automation in Construction, 2013, 29:183-195.doi: 10.1016/j.autcon.2012.05.006

[22]

Peterson, F., et al., Teaching construction project management with BIM support:Experience and lessons learned.Automation in Construction, 2011.20(2):p.115-125.doi: 10.1016/j.autcon.2010.09.009

[23]

Rüppel U., Schatz K.Designing a BIM-based serious game for fire safety evacuation simulations[J].Advanced Engineering Informatics, 2011, 25(4):600-611.doi: 10.1016/j.aei.2011.08.001

[24]

Lagüela S., Díaz-Vilariño L, Martinez J, et al.Automatic thermographic and RGB texture of as-built BIM for energy rehabilitation purposes[J].Automation in Construction, 2013, 31:230-240.doi: 10.1016/j.autcon.2012.12.013

[25]

Martins J P., Monteiro A.LicA:A BIM based automated code-checking application for water distribution systems[J].Automation in Construction, 2013, 29:12-23.doi: 10.1016/j.autcon.2012.08.008

[26]

Aram S., Eastman C., Sacks R.Requirements for BIM platforms in the concrete reinforcement supply chain[J].Automation in Construction, 2013. 

Metrics
  • PDF Downloads(26)
  • Abstract views(1276)
  • HTML views(769)
Catalog

Figures And Tables

Summarize on Current Situation of Foreign BIM Implementation

Yang DeLei

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn