Citation: Liu Jun, Meng Fangui, Dong Jianfeng, Li Zhi, Shu Zhiqiang. Design of BIM-based Owner Project Management System. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(2): 43-47.
2015, 7(2): 43-47.
Design of BIM-based Owner Project Management System
1. | TIANJIN TIANFANG CONSTRUCTION ENGINEERING CO., LTD., Tianjin 300350, China |
2. | NCEC (Tianjin) CO., LTD., Tianjin 300350, China |
3. | CABR Technology CO., LTD., Beijing 100013, China |
According to the NCEC's requirement for BIM applications, this article proposed a project management framework which integrates model document and project construction data. It can not only store massive BIM file generated during project construction, but also achieve BIM based multi-stakeholder project management.
[1] |
曹乐, 肖靖等.BIM技术在长江传媒大厦项目中阶段性应用(一) [J].土木建筑工程信息技术, 2014, 6(2):80-83. |
[2] | |
[3] |
刘隽, 孟凡贵等.国家会展中心(天津)项目BIM实施管理研究[J].土木建筑工程信息技术, 2014, 6(6):58-63. |
[4] | |
[5] |
Metrics
- PDF Downloads(19)
- Abstract views(1232)
- HTML views(917)