• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Wang Yingbin, Li Guohua, Wang Haifeng. Comprehensive BIM Application in Super-Scaled Mexi River Double-Track Bridge of Zhengzhou-Wanzhou Railway in Fengjie. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(5): 60-66. doi: 10.16670/j.cnki.cn11-5823/tu.2018.05.09

2018, 10(5): 60-66. doi: 10.16670/j.cnki.cn11-5823/tu.2018.05.09

Comprehensive BIM Application in Super-Scaled Mexi River Double-Track Bridge of Zhengzhou-Wanzhou Railway in Fengjie

The Civil Construction Engineering Co., Ltd., CRECSH Group, Shanghai 201900, China

Web Publishing Date: 2018-10-01

[1]

李安福, 曾政祥, 吴晓明.浅析国内倾斜摄影技术的发展[J].测绘与空间地理信息, 2014(9):57-59.doi: 10.3969/j.issn.1672-5867.2014.09.017

[2]

张祖勋, 张剑清.数字摄影测量学[M].武汉大学出版社, 2012.

[3]

镇洲, 张学之.基于倾斜摄影测量技术快速建立城市三维模型研究[J].测绘与空间地理信息, 2012, 35(4):117-119.doi: 10.3969/j.issn.1672-5867.2012.04.037

Metrics
  • PDF Downloads(33)
  • Abstract views(2218)
  • HTML views(871)
Catalog

Figures And Tables

Comprehensive BIM Application in Super-Scaled Mexi River Double-Track Bridge of Zhengzhou-Wanzhou Railway in Fengjie

Wang Yingbin, Li Guohua, Wang Haifeng

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn