Citation: Zhang Yuanchun, Zhao Fuzhuang, Ti Yao, Wang Ning. Integrated Application of BIM Technology in Project of Subway Line 7 East Extension 01 Section in Beijing. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(5): 53-59. doi: 10.16670/j.cnki.cn11-5823/tu.2018.05.08
2018, 10(5): 53-59. doi: 10.16670/j.cnki.cn11-5823/tu.2018.05.08
Integrated Application of BIM Technology in Project of Subway Line 7 East Extension 01 Section in Beijing
Beijing Urban & Rural Construction Group Co., Ltd., Beijing 100069, China |
The BIM technology is applied in the Beijing Subway Line 7 East Extension 01 Section to assist professional works including standardization construction, technical management, safety and quality management, schedule management, cost management, construction safety risk management and steel numerical control machining. Thus, multiple collaboration management can be carried out with the help of BIM and other technologies, achieving lean construction and digital control. With the application of BIM, the information management ability has been improved effectively, with better project management ability and innovation ability, which assists the construction of "Smart Site" of the project.
[1] | |
[2] |
曾凤柳, 邱慧, 谢汉生等.绿色城市轨道交通建设的探讨[J].现代城市轨道交通, 2012(01):47-51.doi: 10.3969/j.issn.1672-7533.2012.01.015 |
[3] |
李多贵.BIM技术在地铁工程的应用初探[J].工程质量, 2013, 31(10):52-54.doi: 10.3969/j.issn.1671-3702.2013.10.013 |
Metrics
- PDF Downloads(24)
- Abstract views(2060)
- HTML views(904)