Citation: Geng Yueyun, Liu Haijun. Application of BIM Throughout Project Life Cycle of Longfor Shanghai Hongqiao Street. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(4): 40-45. doi: 10.16670/j.cnki.cn11-5823/tu.2016.04.07
2016, 8(4): 40-45. doi: 10.16670/j.cnki.cn11-5823/tu.2016.04.07
Application of BIM Throughout Project Life Cycle of Longfor Shanghai Hongqiao Street
Shanghai Gstone Architectural Design Co., Ltd., Shanghai 201906, China |
The application technology of BIM at the design and construction stage becomes more and more mature, and is also applied more and more in research and development practice at the operation and maintenance phase.The value of BIM is becoming more and more obvious and has been recognized by all parties.Especially in accordance to the owner′s requirements, all participants implement, use and maintain BIM at the same time.As the third party consultants for the owner, our team help the owner establish enterprise BIM collaborative implementation standard procedure from such aspects as standard planning, process grooming, standard application and expansion application.This article focuses on the establishment of standard framework at the starting phase of the project.
[1] |
何关培, BIM在建筑业的位置、评价体系及可能应用[J].土木建筑工程信息技术, 2010, 2(1): 109-116. |
[2] |
美国国家BIM标准第一版第一部分; National Institute of Building Sciences, United States National Building Information Modeling Standard, Version 12 Part 1. |
[3] |
buildingSMART alliance of National Institute of Building Sciences, BIM Project Execution Planning Guide, Version 1.0. |
[4] |
中国BIM门户网站.http://www.chinabim.com/. |
Metrics
- PDF Downloads(18)
- Abstract views(1672)
- HTML views(690)