• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Geng Yueyun, Liu Haijun. Application of BIM Throughout Project Life Cycle of Longfor Shanghai Hongqiao Street. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(4): 40-45. doi: 10.16670/j.cnki.cn11-5823/tu.2016.04.07

2016, 8(4): 40-45. doi: 10.16670/j.cnki.cn11-5823/tu.2016.04.07

Application of BIM Throughout Project Life Cycle of Longfor Shanghai Hongqiao Street

Shanghai Gstone Architectural Design Co., Ltd., Shanghai 201906, China

Web Publishing Date: 2016-08-01

[1]

何关培, BIM在建筑业的位置、评价体系及可能应用[J].土木建筑工程信息技术, 2010, 2(1): 109-116.

[2]

美国国家BIM标准第一版第一部分; National Institute of Building Sciences, United States National Building Information Modeling Standard, Version 12 Part 1.

[3]

buildingSMART alliance of National Institute of Building Sciences, BIM Project Execution Planning Guide, Version 1.0.

[4]

中国BIM门户网站.http://www.chinabim.com/.

Metrics
  • PDF Downloads(18)
  • Abstract views(1671)
  • HTML views(690)
Catalog

Figures And Tables

Application of BIM Throughout Project Life Cycle of Longfor Shanghai Hongqiao Street

Geng Yueyun, Liu Haijun

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn